We are taking steps to continue to modernize and secure our data, applications, and systems. We completed the first phase and restored many of the functions put on pause in May 2021. Now that the first phase is complete, work will resume at a slower pace but will speed up as new systems and applications are brought online. For more information and updates, please visit our Cybersecurity Modernization Initiative web page.
Advisory Board: Reports from the Technical Support Contractor
The Advisory Board has a technical support contractor, Sanford Cohen & Associates, Inc. (SC&A). SC&A reviews individual dose reconstructions, technical documents used in dose reconstruction, and Special Exposure Cohort (SEC) petitions.
Below is a list of the reports from SC&A’s reviews. The reports serve as research and background tools to aid in discussions and considerations of the Advisory Board and its Subcommittees and Work Groups.
Note: When the reviews are compAClete and all issues have been resolved, the Board prepares a brief summary of the resolutions. These summaries help the public understand the results of the technical reviews. Summaries of these reports are located on the Advisory Board: Technical Review Summaries from the Technical Support Contractor page, when available.
Locate Reports Alphabetically by General Topics
Do you know the general topic of the report you are looking for? If you do, click on the letter below that corresponds to the first letter of that topic. For example, if you are looking for reports on the Linde Ceramics Plant, click on “L” to jump down to the list where reports on the general topic starting with “L” begins.
List of Reports from the Technical Support Contractor
A
-
Albuquerque Operations Office
-
SC&A Presentation: Dose Reconstruction Template Review for the Albuquerque Operations Office [276 KB (33 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews
-
-
Aliquippa Forge
-
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (95 pages)]
Presentation at the April 19-20, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Review of NIOSH’s Response to DCAS-PER-045 Findings [503 KB (12 pages)]
March 24, 2015 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-045, “Aliquippa Forge TBD Revision” [1.2 MB (33 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0092, Rev. 0
August 20, 2014 -
SC&A Draft: A Pre-Evaluation of DCAS-PER-041, DCAS-PER-042, DCAS-PER-043, DCAS-PER-044, and DCAS-PER-045 for a Formal Audit by SC&A [318 KB (9 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0003, Rev. 0
April 10, 2014
-
-
Allegheny-Ludlum Steel
-
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-067, “Allegheny Ludlum Appendix Q Revision” [283 KB (27 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-067, “Allegheny Ludlum Appendix Q Revision” [499 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR067, Revision 0
August 9, 2023
-
-
Allied Chemical and Dye Corp.
-
SC&A Memo: Responses to 17th Set Blind Remaining Issues [55 KB (2 pages)]
November 24, 2015 -
SC&A: Calculation of 222Rn Concentrations at Allied Chemical and Dye Corporation, North Claymont, Delaware [304 KB (8 pages)]
June 30, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case [REDACTED] from the Allied Chemical and Dye Corporation, North Claymont, Delaware [507 KB (20 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2014-CN[REDACTED], Rev. 0
December 19, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #[REDACTED] from the Allied Chemical Plant [505 KB (30 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED], Rev. 0
February 21, 2014
-
-
Allied Chemical Corp. Plant
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-053, “Allied Chemical Corporation” [408 KB (16 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2015-0096
July 7, 2015 -
Draft: Review of the NIOSH Site Profile for Allied Chemical Corporation Plant, Metropolis, Illinois [210 KB (28 pages)]
Contract No. 200-2009-25888
SCA-TR-SP2011-0012, Revision 0
September 29, 2011
-
-
Aluminum Company of America (Alcoa)–Pennsylvania
-
SC&A Presentation: Review of the Advisory Board-Selected Case Reworked for the Evaluation of Aluminum Company of America – Pennsylvania Technical Basis Document Revisions (DCAS-PER-063, Subtask 4) [268 KB (16 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-063, “Aluminum Company of America – Pennsylvania (ALCOA PN)” [157 KB (16 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR008, Revision 0
July 17, 2017
-
-
Amchitka Island Nuclear Explosion Site
-
SC&A Presentation: Dose Reconstruction Methodology and Case Review for Amchitka Island Nuclear Explosion Site [624 KB (30 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews
-
-
Ames Laboratory
-
SC&A Draft: SC&A’s Review of the NIOSH Document Issued March 3, 2016, Titled, “Discussion of Ames Laboratory TBD Findings on External Dose” [97 KB (12 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SP007, Rev. 0
June 28, 2016 -
SC&A Draft: SC&A’s Review of the NIOSH Document Issued July 29, 2015, Titled, “NIOSH Response to SC&A Review of the Ames Site Profile Document Regarding Uranium Internal Exposure” [107 KB (14 pages)]
Contract No. 211-2014-58081, Revision 0
September 8, 2015 -
SC&A Draft: Review of the NIOSH Site Profile for the Ames Laboratory [7 MB (159 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2013-0044, Revision 0
August 14, 2013 -
SC&A Draft: A Preliminary Review of NIOSH’s Program Evaluation Report DCAS-PER-037, “Ames Laboratory TBD Revision” [159 KB (23 pages)]
Contract No. 200-2004-03805
SCA-TR-PR2013-0037, Rev. 0
January 2, 2013
-
-
Anaconda Co.
-
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Anaconda Technical Basis Document Revisions (DCAS-PER-065, Subtask 4) [309 KB (17 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: Review of NIOSH’s Program Evaluation Report DCAS-PER-065, “Anaconda” [638 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR004, Revision 0
June 15, 2017
-
-
Analysis of Bioassay Data with a Significant Fraction of Less-Than Results
-
Draft: Review of ORAUT-RPRT-0044: Analysis of Bioassay Data with a Significant Fraction of Less-Than Results [201 KB (21 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2010-0009, Revision 0
November 12, 2010
Note: ORAUT-RPRT-0044 Rev 00 was canceled on May 2, 2019. The statistical methods in this document are no longer needed. Techniques to handle the types of data described in this document are now handled in ORAUT-RPRT-0096 Rev. 00, Multiple Imputation Applied to Bioassay Coworker Models.
-
-
Analysis of Stratified Coworker Dataset
-
SC&A Draft: Review of ORAUT-RPRT-0053: Analysis of Stratified Coworker Datasets, Rev. 1 [472 KB (55 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0053, Rev. 0
April 23, 2013
-
-
Application of NOCTS Data 2021
-
Area IV of the Santa Susana Field Laboratory
-
SC&A Draft: SC&A Evaluation of Petitioner-Supplied Material for SEC-00246 and SEC-00235 [357 KB (29 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SEC005, Revision 0
October 9, 2020 -
SC&A: Update on SEC-00235 (Area IV) and SEC-00246 (De Soto) Evaluations [344 KB (23 pages)]
Presentation at the December 8-9, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Summary of Recent SC&A Work Products for SEC-00235 and SEC-00246 Evaluations [656KB (34 pages)]
Presentation at the October 15, 2020, Teleconference Meeting of the Advisory Board’s Work Group on the Area IV of Santa Susana Field Laboratory & De Soto Avenue Facility -
SC&A Memo: Summary of Worker Interviews Conducted in 2018 and 2019 in Support of the SEC-00246 Evaluation [119 KB (5 pages)]
July 14, 2020 -
SC&A Draft: Review of Documentation Provided by CORE Advocacy Related to the Evaluation of SEC-00235 at the Santa Susana Field Laboratory [2 MB (29 pages)]
November 25, 2019 -
SC&A Presentation: Santa Susana Field Laboratory (Area IV) SEC Petition-00235 Follow-Up Items [59 KB (13 pages)]
Presentation at the August 21, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Evaluation of Petitioner-Specific Concerns Regarding SEC-00235 [365 KB (13 pages)]
July 25, 2019 -
SC&A Memo: Review and Characterization of Boeing Incident Database for SEC-00246 [83 KB (7 pages)]
June 10, 2019 -
SC&A: Santa Susana Field Laboratory (Area IV) SEC Petition-00235 Preliminary Review [245 KB (27 pages)]
Presentation at the April 17, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Santa Susana Field Laboratory (Area IV) SEC Petition-00235 Preliminary Review [244 KB (22 pages)]
Presentation at the March 25, 2019, Teleconference Meeting of the Advisory Board’s Work Group on the Area IV of Santa Susana Field Laboratory -
SC&A Draft: Review of Remaining Internal Dose Topics Related to the Evaluation of SEC-00235 at the Santa Susana Field Laboratory [347 KB (27 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-SEC002, Revision 0
February 20, 2019 -
SC&A Presentation: De Soto Facility SEC Petition-00246 Preliminary Review [1 MB (29 pages)]
Presentation at the December 3, 2018, Teleconference Meeting of the Advisory Board’s Work Group on the Area IV of Santa Susana Field Laboratory -
SC&A Presentation: Review Status of Area IV Santa Susana Field Laboratory SEC Petition-00235 [550 KB (14 pages)]
Presentation at the December 13-14, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: A Focused Review of the NIOSH SEC-00235 Petition Evaluation Report for Santa Susana Field Laboratory Area IV [510 KB (29 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC011, Revision 0
November 21, 2017 -
SC&A Draft: A Review of “ORAUT-OTIB-0080, Rev. 00: Internal Coworker Dosimetry Data for Area IV of the Santa Susana Field Laboratory and the DeSoto Avenue Facility,” Rev. 0 [1 MB (69 pages)]
Contract No. 211-2014-58081
SCA-TR-OTIB2014-0080, Rev. 0
November 24, 2014 -
SC&A Draft White Paper: Review of NIOSH White Paper – Neutron Exposures at Area IV of the Santa Susana Field Laboratory and Related Sites, Rev. 0 [584 KB (20 pages)]
Contract Number 211-2014-58081
Approved October 22, 2014 -
SC&A Working Draft: Issues Matrix for the Santa Susana SEC Petition and NIOSH Evaluation Report [358 KB (25 pages)]
Contract Number 200-2009-28555
Updated September 2014 -
SC&A Draft White Paper: Review of Database Used to Develop ORAUT-OTIB-0077: External Coworker Dosimetry Data for Area IV of the Santa Susana Field Laboratory, Rev. 1 [161 KB 919 pages)]
Contract No. 200-2009-28555
Revised March 15, 2010 -
SC&A Draft: Review of the Santa Susana Field Laboratory (SSFL) Area IV Special Exposure Cohort (SEC) Petition-00093 and the NIOSH SEC Petition Evaluation Report [868 KB (57 pages)]
Contract No. 200-2009-28555
Task Order No. 5
SCA-SEC-TASK5-0066 Rev-01
Revised October 29, 2009 -
SC&A Draft: Review of the NIOSH Site Profile for the Santa Susana Field Laboratory, with Attachment 1: Summary of Site Expert Interviews [547 KB (77 pages)]
Contract No. 200-2009-28555
Task Order No. 1 SCA-TR-TASK1-0027
Updated August 16, 2008 -
SC&A Draft: Review of the NIOSH Site Profile for the Santa Susana Field Laboratory [362 KB (57 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0027
Approved August 16, 2008
-
-
Argonne National Laboratory–East (ANLE)
-
SC&A Presentation: Summary of Six Document Reviews Approved by the Subcommittee for Procedure Reviews [691 KB (73 pages)]
Presentation at the December 5, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memorandum: Update: ANL-E Site Profile Finding 12 [145 KB (4 pages)]
October 24, 2018 -
SC&A Memo: Current Status of ANL-E Site Profile Findings and Observations [88 KB (11 pages)]
May 10, 2018 -
SC&A Memo: Current Status of ANL-E Site Profile Findings and Observations [59 KB (7 pages)]
July 17, 2017 -
SC&A Draft: SC&A Recommendations Regarding Issues Resolution for the Site Profile for Argonne National Laboratory-East [142 KB (18 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SP005, Revision 1
June 5, 2016 -
SC&A Draft: A Review of NIOSH’S “Program Evaluation Report: Evaluation of Incomplete Internal Dosimetry Records from Idaho, Argonne – East and Argonne – West National Laboratories” [436 KB (49 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2012-0017, Rev. 0
May 15, 2012 -
Draft: Review of the NIOSH Site Profile for the Argonne National Laboratory-East [912 KB (103 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0023
March 2009
-
-
Argonne National Laboratory–West (ANLW)
-
SC&A Presentation: Summary of Six Document Reviews Approved by the Subcommittee for Procedure Reviews [691 KB (73 pages)]
Presentation at the December 5, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Review of ORAUT-RPRT-0099 Evaluation of EBR-II and BORAX-IV for ORAUT-OTIB-0054 Applicability [132 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC001, Revision 0
January 15, 2021 -
SC&A: INL/ANL-W Site Profile BRS Status [256 KB (6 pages)]
Presentation at the July 16, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A: Reactor Characterization Studies [207 KB (5 pages)]
Presentation at the July 16, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A: Review of NIOSH Response to SC&A Draft Review of NIOSH’s Evaluation Report for Petition SEC-00219, Idaho National Laboratory: Burial Ground, 1952–1970 [1.5 MB (18 pages)]
Presentation at the July 16, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A Memo: Interim Status of Verification and Validation Activities for CPP (1963–1970) [389 KB (9 pages)]
July 26, 2018 -
SC&A Draft: Evaluation of Uranium Dose Reconstruction Methods at CPP (1953–1962) [381 KB (18 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC003, Revision 0
July 25, 2018 -
SC&A Presentation: INL/ANL-W Reactor Prioritization & Other Reactor-Related Issues [501 KB (23 pages)]
(Presentation from the May 16, 2017, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory) -
SC&A Draft: SC&A’s Evaluation of Cs-137/Sr-90, Fission and Activation Product, and Actinide Values Using ANL-W Monthly and Annual Waste Reports in Relationship to Assigning Intakes [457 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC002, Revision 0
January 20, 2017 -
SC&A Draft: SC&A’s Evaluation of Cs-137/Sr-90, Fission and Activation Product, and Actinide Values Using INL Monthly and Annual Waste Reports in Relationship to Assigning Intakes [5.8 MB (39 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC001, Revision 0
January 11, 2017 -
SC&A Draft: Response to NIOSH Reactor Analysis Plan and Consolidation of All Reactor Modeling Comments [1 MB (59 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC012, Revision 0
December 8, 2016 -
SC&A Presentation: SC&A Status Update: SEC-00219 INL and SEC-00224 ANL-W [479 KB (58 pages)]
Presented at the August 9-10, 2016, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Integrated Status Report of Site Profile and SEC Issues Related to INL and ANL-W [690 KB (48 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC011, Revision 0
July 15, 2016 -
SC&A Memo: SC&A’s July 2016 Progress Report: ANL-W Area Monitoring Data Review [67 KB (5 pages)]
July 14, 2016 -
SC&A Draft: Argonne National Laboratory-West SEC-00224 Reactor Prioritization for Evaluation of ORAUT-OTIB-0054 Applicability [224 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC010, Revision 0
July 13, 2016 -
SC&A Draft: Review of Petition Evaluation Report for SEC-00224, Argonne National Laboratory-West Regarding the Use of General Area Air Sampling for Internal Dose Assessment [15.4 MB (43 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC009, Revision 0
July 13, 2016 -
SC&A Draft: Evaluation of Monitoring Practices for Claimants at Argonne National Laboratory–West [1 MB (59 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC008, Revision 0
July 8, 2016 -
SC&A Draft: SC&A’s Evaluation of CS-137/SR-90 Values and Actinides Using INL Waste Reports in Relationship to Assigning Intakes, Rev. 0 [520 KB (31 pages)
Contract No. 211-2014-58081 SCA-TR-2016-SEC007, Revision 0
June 24, 2016 -
SC&A Draft: INL SEC-00219 Reactor Prioritization for Evaluation of ORAUT-OTIB-0054 Applicability, Rev. 1 [435 KB (44 pages)
Contract No. 211-2014-58081 SCA-TR-2016-SEC002, Revision 1
June 10, 2016 -
SC&A Draft: A Review of NIOSH’S “Program Evaluation Report: Evaluation of Incomplete Internal Dosimetry Records from Idaho, Argonne – East and Argonne – West National Laboratories” [436 KB (49 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2012-0017, Rev. 0
May 15, 2012
-
-
AWE Site Wide Documents
-
Draft Review of Battelle-TBD-6001, Site Profiles for Atomic Weapons Employers That Worked Uranium And Thorium Metals, Revision FO Dated December 13, 2006 [378 KB (53 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0026
February 2008
-
B
-
Baker Brothers
-
Baker-Perkins Co.
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-039, “Baker Perkins TBD Revision” [403 KB (14 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PR039, Revision 0
September 4, 2024 -
SC&A Draft White Paper: SC&A Response to NIOSH White Paper, “Baker-Perkins TBD Review,” Dated December 12, 2011 [211 KB (18 pages)]
Contract No. 200-2009-28555
January 17, 2012 -
SC&A Draft: Review of the NIOSH Site Profile for Baker-Perkins, Saginaw, Michigan (DCAS-TKBS-0005) [255 KB (15 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0036, Revision 1
November 2, 2011
-
-
Battelle Laboratories (King Avenue)
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-075, "Battelle Memorial Institute TBD Revision" [824 KB (24 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PER075, Revision 0
September 26, 2024
-
-
Battelle Laboratories (West Jefferson)
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-075, "Battelle Memorial Institute TBD Revision" [824 KB (24 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PER075, Revision 0
-
-
Bethlehem Steel Company
-
SC&A: Review of NIOSH Site Profile for Bethlehem Steel Plant, Lackawanna, NY [512 KB (87 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0001
October 2004
-
-
Birdsboro Steel & Foundry Company
-
SC&A Memo: Reply to NIOSH Response to SC&A Review Comments on PER-073 [489 KB (4 pages)]
June 7, 2023 -
SC&A Presentation: Review of DCAS-PER-073 – Birdsboro Steel Foundry and Machine Company [227 KB (15 pages)]
(Presentation at the February 13, 2019, Teleconference Meeting of the Subcommittee for Procedures Review) -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-073, “Birdsboro Steel and Foundry Company” [188 KB (25 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PR003, Revision 0
June 7, 2018
-
-
Bliss and Laughlin Steel
-
Blockson Chemical Company
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-036, “Blockson TBD Revision” [402 KB (16 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PR036, Revision 0
September 11, 2024 -
SC&A Memo: Final SC&A Position on the Application of Overtime Hours at Blockson [95 KB (8 pages)]
May 22, 2018 -
SC&A Draft: Draft Review of Blockson Chemical Company Residual Period SEC-00225 [846 KB (47 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC003, Revision 1
June 3, 2016 -
SC&A Draft: Strategies for Validating the Blockson Radon Model and Addressing Stratification Issues [40 KB (6 pages)]
September 9, 2009 -
SC&A Draft: A Preliminary Review of NIOSH’s Program Evaluation Report OCAS-PER-020, “Blockson TBD Revision” [294 KB (25 pages)]
Contract No. 200-2009-28555
SCA-TR-TASK3-0012, Rev. 0
March 2009 -
SC&A Draft: Evaluation of Radon Levels in Building 40 at Blockson Chemical Company [546 KB (35 pages)]
August 12, 2008 -
SC&A Memo and Draft Report: Focused Review of the NIOSH Evaluation Report for the Blockson Chemical Company SEC Petition [471 KB (38 pages)]
Contract No. 200-2004-03805
Task Order No. 5
January 10, 2007
-
-
Bridgeport Brass Company
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-061: Bridgeport Brass Company [234 KB (27 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR005, Revision 0
July 10, 2017 -
SC&A Memo: Questions/Status of Bridgeport Brass Findings [104 KB (3 pages)]
February 26, 2013
-
-
Brookhaven National Laboratory
-
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: SC&A’S Issues Matrix for the Brookhaven National Laboratory Site Profile Technical Basis Document [67 KB (16 pages)]
February 13, 2012 -
SC&A Memo: SC&A’s Reply to NIOSH’s March 28, 2012, Responses to BNL SEC Issues [42 KB (7 pages)]
May 22, 2012 -
SC&A Draft: Preliminary Issues from SC&A’s Review of NIOSH’s Evaluation Report for Brookhaven National Laboratory Special Exposure Cohort Petition SEC-00113: Availability of Bioassay Records and Adequacy of Neutron Dosimetry [847 KB (23 pages)]
Contract No. 200-2009-28555
SCA-SEC-2010-0011, Revision 0
February 2010 -
SC&A Draft: Review of the NIOSH Site Profile for Brookhaven National Laboratory [462 KB (59 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-SP2009-0001
September 2009
-
C
-
Carborundum Company
-
SC&A: Review of “Site Profile for The Carborundum Company” [206 KB (11 pages)]
November 25, 2020 -
SC&A Memo: Reply to NIOSH Response to Findings on the MCNP Analysis for Carborundum [SRDB Ref ID: 176629] [775 KB (7 pages)]
April 24, 2019 -
SC&A: Audit of NIOSH Assessment of External Doses from Plutonium Fuel Pellets [1.4 MB (9 pages)]
Presentation for the December 4, 2018, Teleconference Meeting of the Advisory Board’s Work Group on Carborundum Company -
SC&A Memo: Review of NIOSH Report on Resolution of Site Profile Issues for Carborundum [50 KB (4 pages)]
November 28, 2018 -
SC&A Memo: Final Audit of NIOSH Response Paper and Example DRs [197 KB (19 pages)]
June 30, 2017 -
SC&A Memo: Updated Status Report on SC&A Review of NIOSH Response Paper [163 KB (5 pages)]
March 12, 2017 -
SC&A Memo: Review of NIOSH Use of Surrogate Data in the SEC Evaluation Report for Carborundum [93 KB (7 pages)]
November 10, 2016 -
SC&A Draft: Review of the Carborundum Special Exposure Cohort (SEC) Petition-00223 and the NIOSH SEC Petition Evaluation Report, Rev. 1 [443 KB (53 pages)]
Contract Number 211-2014-58081
SC&A-TR-SEC-2016-0001, Revision 1
January 27, 2016
-
-
Chapman Valve
-
Draft: Issues Connected to the Chapman Valve Exposure Matrix and the SEC Petition Evaluation Report [2.1 MB (120 pages)]
Contract No. 200-2004-03805
Task Order No. 5
SCA-SEC-TASK5-0054
December 6, 2006
-
-
Chronic Lymphocytic Leukemia
-
SC&A: ORAUT-OTIB-0082 Dose Reconstruction Method for Chronic Lymphocytic Leukemia [183 KB (15 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: A Limited Review of ORAUT-OTIB-0082, Rev. 00 PC-1, Dose Reconstruction Method for Chronic Lymphocytic Leukemia, Rev. 0 [465 KB (19 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0091
October 16, 2014
-
-
Clarksville Modification Center (formerly known as Clarksville Facility)
-
SC&A Presentation: SC&A’s Review of DCAS-PER-087, “Clarksville and Medina Modification Centers” [343 KB (27 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-087, “Clarksville and Medina Modification Centers” [446 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PER087, Revision 1
September 28, 2021 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-087, “Clarksville and Medina Modification Centers” [176 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PER087, Revision 0
August 24, 2021 -
SC&A Draft: Review of the Site Profile for the Clarksville and Medina Plants [164 KB (32 pages)]
Contract No. 200-Clarksville Facility
SCA-TR-SP2012-0007, Rev. 0
February 22, 2012
-
-
Construction Trade Workers (General, not site specific)
-
SC&A Draft: OCAS-PER-014, Subtask 4: Review of Select Cases Reworked for the Evaluation for Construction Trade Worker Coworker Dose, Rev. 1 [613 KB (44 pages)]
Contract No. 200-2009-28555
April 30, 2013 -
Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-014, Construction Trades Workers [228 KB (21 pages)]
Contract No. 200-2009-28555
SCA-TR–PR2012-0014, Rev. 0
March 2012 -
Draft: Review of ORAUT-OTIB-0052, Parameters to Consider When Processing Claims for Construction Trade Workers [127 KB (26 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2011-0004, Rev. 0
Document No. SCA-TR-PR2011-0004
July 11, 2011
-
-
Coworker Datasets, Models, and Studies
-
SC&A Memo: Status of Issues Relating to the Development of Coworker Models [262 KB (8 pages)]
September 5, 2014 -
SC&A Memo: Preliminary Review and Comments on Three NIOSH White Papers Related to Coworker Modeling [710 KB (21 pages)]
July 25, 2014 -
SC&A Draft: Review of Proposed One Person-One Sample (OPOS) Approach to Coworker Modeling [2 MB (99 pages)]
Contract No. 200-2009-28555
SCA-SEC-PR2014-0053, Revision 0
February 21, 2014 -
SC&A Presentation: One Person-One Sample (OPOS) Approach to Coworker Modeling [813 KB (25 pages)]
-
SC&A Draft: Review of ORAUT-RPRT-0053: Analysis of Stratified Coworker Datasets, Rev. 1 [473 KB (55 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0053, Revision 0
April 23, 2013 -
SC&A Draft: SC&A Technical Response to NIOSH Regarding Data Completeness of Proposed In-Vivo Thorium Coworker Model for Fernald [1.4 MB (46 pages)]
Contract No. 200-2009-28555, Rev. 0
August 4, 2011 -
SC&A Draft White Paper: Review of “Thorium In-Vivo Coworker Study for FEMP – A Proposed Attachment for ORAUT-TKBS-0017-5, Rev. 1” [491 KB (37 pages)]
Contract Number 200-2009-28555
June 28, 2010 -
SC&A Draft White Paper: Review of ORAUT-OTIB-0075 – Use of Claimant Datasets for Coworker Modeling for Construction Workers at Savannah River Site [601 KB (66 pages)]
Contract No. 200-2009-28555
January 13, 2010
-
D
-
Dana Heavy Water Plant
-
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Dana Heavy Water Plant and Savannah River Site, Rev. 1 [527 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACTED]
April 16, 2015
-
-
De Soto Avenue Facility
-
SC&A: Update on SEC-00235 (Area IV) and SEC-00246 (De Soto) Evaluations [344 KB (23 pages)]
Presentation at the December 8-9, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Summary of Recent SC&A Work Products for SEC-00235 and SEC-00246 Evaluations [656KB (34 pages)]
Presentation at the October 15, 2020, Teleconference Meeting of the Advisory Board’s Work Group on the Area IV of Santa Susana Field Laboratory & De Soto Avenue Facility -
SC&A Draft: SC&A Evaluation of Petitioner-Supplied Material for SEC-00246 and SEC-00235 [357 KB (29 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SEC005, Revision 0
October 9, 2020 -
SC&A Memo: Summary of Worker Interviews Conducted in 2018 and 2019 in Support of the SEC-00246 Evaluation [119 KB (5 pages)]
July 14, 2020 -
SC&A Memo: Review and Characterization of Boeing Incident Database for SEC-00246 [83 KB (7 pages)]
June 10, 2019 -
SC&A: De Soto Facility SEC Petition-00246 Preliminary Review [982 KB (29 pages)]
Presentation at the December 12-13, 2018, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Review of the NIOSH Evaluation Report for SEC-00246 at the DeSoto Facility (1965–1995) [6 MB (75 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC006, Revision 0
December 7, 2018 -
SC&A Presentation: De Soto Facility SEC Petition-00246 Preliminary Review [1 MB (29 pages)]
Presentation at the December 3, 2018, Teleconference Meeting of the Advisory Board’s Work Group on the Area IV of Santa Susana Field Laboratory -
SC&A Draft: Review of “ORAUT-OTIB-0080, Rev. 00: Internal Coworker Dosimetry Data for Area IV of the Santa Susana Field Laboratory and the DeSoto Avenue Facility,” Rev. 0 [1.3 MB (69 pages)]
Contract No. 211-2014-58081
SCA-TR-OTIB2014-0080, Rev. 0
November 24, 2014
-
-
Dose Reconstruction Case Reviews
-
SC&A Presentation: Dose Reconstruction Methodology and Case Review for Amchitka Island Nuclear Explosion Site [624 KB (30 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Peek Street Facility Case Reviews [452 KB (20 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of Three Advisory Board-Selected Cases Reworked for the Evaluation of Westinghouse Nuclear Fuels Division Template Revisions [740 KB (36 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Newly Issued Documents and Relevant Supplemental Topics for Discussion [276 KB (8 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Norton Dose Reconstruction Template Revisions (DCAS-PER-059, Subtask 4) [333 KB (15 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of ORAUT-OTIB-0052 Revisions (DCAS-PER-062, Subtask 4) [262 KB (24 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Aliquippa Forge Technical Basis Document Revisions (DCAS-PER-045, Subtask 4) [389 KB (17 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo: Final Audit of NIOSH Response Paper and Example DRs [197 KB (19 pages)]
June 30, 2017 -
SC&A Draft: Evaluation of New Claims Filed Since the Summer of 2015 for Idaho National Laboratory – Executive Summary [98 KB (10 pages)
Contract No. 211-2014-58081
SCA-TR-2016-SEC004-Summary, Revision 0
July 6, 2016 -
SC&A Memo: Summary Statistics Representing Sets 6 through 13; Revision 3 [309 KB (11 pages)]
January 7, 2016 -
SC&A Memo: Re-Evaluation of the Finding Ranks Following Issues Resolution [435 KB (21 pages)]
January 7, 2016 -
SC&A Memo: Responses to 17th Set Blind Remaining Issues [55 KB (2 pages)]
November 24, 2015 -
SC&A Draft White Paper: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Hanford Site and Weldon Spring Plant, Rev. 0 [1 MB (42 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[Redact]
June 17, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] From the Hanford Site, Rev. 0 [266 KB (13 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015- CN[Redact]
May 12, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Dana Heavy Water Plant and Savannah River Site, Rev. 1 [527 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACTED]
April 16, 2015 -
SC&A Draft: Comparison of SC&A’S Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 1 [893 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACT], Revision 1
April 16, 2015 -
SC&A Draft: Comparison of SC&A’S Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 0 [601 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACT]
February 13, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redacted] from the Hanford and the Grand Junction Operations Office [487 KB (20 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[Redacted]
January 27, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case [REDACTED] from the Allied Chemical and Dye Corporation, North Claymont, Delaware [507 KB (20 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2014-CN[REDACTED], Rev. 0
December 19, 2014 -
SC&A Presentation: Review of NIOSH Responsiveness to Worker Comments for Los Alamos National Laboratory [130 KB (13 pages)]
Teleconference Meeting of the Advisory Board’s Work Group on Worker Outreach
June 5, 2014 -
SC&A Memo: Westinghouse Nuclear Fuels Division Dose Reconstruction Case from 18th set [178 KB (1 page)]
January 17, 2014 -
SC&A Draft: OCAS-PER-030, Subtask 4 Review of Impacted Cases Reworked for the Evaluation of External Ambient Doses and Internal Intakes from the Savannah River Site, Rev. 0 [341 KB (12 pages)]
Contract No. 211-2014-58081
March 19, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #[REDACTED] from the Y-12 National Security Complex and the X-10 Oak Ridge National Laboratory, Rev. 0 [4 MB (122 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED]
February 24, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #[REDACTED] from the Allied Chemical Plant [505 KB (30 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED], Rev. 0
February 21, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #REDACTED from the Fernald Environmental Management Project [2 MB (75 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED]
January 13, 2014 -
SC&A Draft: SC&A’s Dose Reconstruction of Case #[Redacted] from the Rocky Flats Plant [1 MB (41 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[Redacted]
January 13, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #[Redacted] from Hanford and the Grand Junction Operations Office [3 MB (80 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-[Redacted]
January 21, 2014 -
SC&A Draft: OCAS-PER-014, Subtask 4: Review of Select Cases Reworked for the Evaluation for Construction Trade Worker Coworker Dose, Rev. 1 [613 KB (44 pages)]
Contract No. 200-2009-28555
April 30, 2013 -
SC&A Draft: OCAS-PER-012, Subtask 4, Review of Nine Advisory Board Selected Cases Reworked for the Evaluation of Highly Insoluble Plutonium Compounds [232 KB (46 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2012-0012, Revision 0
July 20, 2012 -
Cases 1-20 (2005)
Note: All Privacy Act information has been removed from the files listed below. The case review number listed does not represent an actual case number. It has been used for ease of presenting this information on this website.
Case Reviews- Case Review #1 [584 KB (31 pages)]
- Case Review #2 [82 KB (17 pages)]
- Case Review #3 [54 KB (17 pages)]
- Case Review #4 [38 KB (11 pages)]
- Case Review #5 [45 KB (14 pages)]
- Case Review #6 [1 MB (34 pages)]
- Case Review #7 [478 KB (21 pages)]
- Case Review #8 [283 KB (16 pages)]
- Case Review #9 [290 KB (20 pages)]
- Case Review #10 [273 KB (15 pages)]
- Case Review #11 [276 KB (14 pages)]
- Case Review #12 [328 KB (25 pages)]
- Case Review #13 [296 KB (18 pages)]
- Case Review #14 [245 KB (11 pages)]
- Case Review #15 [247 KB (11 pages)]
- Case Review #16 [290 KB (17 pages)]
- Case Review #17 [256 KB (10 pages)]
- Case Review #18 [260 KB (11 pages)]
- Case Review #19 [275 KB (18 pages)]
- Case Review #20 [274 KB (17 pages)]
-
-
Dose Reconstruction Procedures and Methods
-
SC&A Presentation: Summary of Six Document Reviews Approved by the Subcommittee for Procedure Reviews [691 KB (73 pages)]
Presentation at the December 5, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of ORAUT-RPRT-0087 on Application of Regression in External Dose Reconstruction [276 KB (16 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation Handout: Sites with Unreviewed DR Methodology Templates and Reports [354 KB (5 pages)]
Presentation Handout at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation Handout: SPR-Approved Document Reviews [468 KB (8 pages)]
Presentation Handout at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: DR Template Reviews – Assessment of NIOSH Approach and Findings versus Observations [261 KB (9 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Summary of Eight Document Reviews Approved by the Subcommittee for Procedure Reviews [317 KB (42 pages)]
Presentation at the August 7-8, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: NIOSH Use of “Extreme Conservatism”: SC&A’s Perspective [398 KB (13 pages)]
January 26, 2024 -
SC&A Presentation Handout: Sites with Unreviewed DR Methodology Templates and Reports [463 KB (5 pages)]
Presentation Handout at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation Handout: SPR-Approved Document Reviews [479 KB (7 pages)]
Presentation Handout at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: Review of ORAUT-RPRT-0071 on External Dose Coworker Methodology [700 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR071, Revision 0
September 29, 2023 -
SC&A Presentation: Accomplishments of the Subcommittee for Procedure Reviews [504 KB (16 pages)]
Presentation at the December 7, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Handout: Sites with Unreviewed DR Methodology Templates and Reports [511 KB (5 pages)]
Presentation Handout for the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Handout: SPR-Approved Document Reviews [358 KB (5 pages)]
Presentation Handout for the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Accomplishments of the Subcommittee for Procedure Reviews [820 KB (15 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [422 KB (71 pages)]
Presentation at the August 16, 2023, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo Handout: SPR-Approved Document Reviews [206 KB (5 pages)]
June 21, 2023 -
SC&A Presentation: Review of ORAUT-RPRT-0085 for Probability of Causation Evaluation of ICRP 116 Anterior-Posterior, Isotropic, and Rotational Geometries [263 KB (28 pages)]
Presentation at the June 21, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of ORAUT-RPRT-0085 for Probability of Causation Evaluation of ICRP 116 Anterior-Posterior, Isotropic, and Rotational Geometries [647 KB (31 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR085, Revision 1
May 11, 2023 -
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (95 pages)]
Presentation at the April 19-20, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo Handout: Sites with Unreviewed DR Methodology Templates and Reports [210 KB (4 pages)]
Handout at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo Handout: SCPR-Approved Document Reviews [193 KB (5 pages)]
Handout at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo Handout: Carryover Items from February 2019 and 2021 SCPR Meetings [661 KB (8 pages)]
Discussion/Background Paper at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
Advisory Board Presentation: Subcommittee for Dose Reconstruction Reviews [174 KB (18 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Summary of Seven Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (89 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of Battelle-TIB-5000 Default Assumptions and Methods for AWE Sites [889 KB (28 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Newly Issued Documents and Relevant Supplemental Topics for Discussion [276 KB (8 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: Review of Battelle-TIB-5000, “Default Assumptions and Methods for Atomic Weapons Employer Dose Reconstructions” [2.3 MB (30 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PR001, Revision 0
January 10, 2022 -
SC&A Presentation: Summary of Five Approved Document Reviews by the Subcommittee for Procedure Reviews [253 KB (18 pages)]
Presentation at the December 8-9, 2021, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Newly Issued Documents and Relevant Supplemental Topics for Discussion [207 KB (8 pages)]
Presentation at the August 18-19, 2021, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Overview of Previously Presented Procedure Reviews [258 KB (43 pages)]
Presentation at the August 18-19, 2021, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Procedures Review Finalization & Approval Process [245 KB (13 pages)]
Presentation at the April 14-15, 2021, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A Review of Dosimetry Coding Methods for Identifying Neptunium Workers at Savannah River Site, Rev. 0 [689 KB (34 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC006, Revision 0
April 10, 2017 -
SC&A Draft: SC&A Review of DCAS-RPT-005, Revision 00, Alternative Dissolution Models for Insoluble Plutonium-238 [255 KB (10 pages)]
January 13, 2017 -
SC&A Memo: Consistency in Dose Reconstruction [42 KB (4 pages)]
March 11, 2016 -
SC&A Memo: Y-12 ORAUT-OTIB-0013 and ORAUT-PROC-0042 Findings and Resolutions [71 KB (7 pages)]
October 20, 2016 -
SC&A Memo: Approach to Expediting DRSC Findings Backlog [306 KB (7 pages)]
July 15, 2015 -
SC&A Draft White Paper: Review of Proposed NIOSH Methods for Reconstructing Thorium Doses at Fernald (1979-2006) [909 KB (50 pages)]
November 24, 2014 -
Draft Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction – Review of the Third Set of Procedures (45 procedure reviews) [2 MB (290 pages)]
Contract No. 200-2004-03805
Task Order No. 3
October 29, 2007 -
Draft Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction [2 MB (260 pages)]
Contract No. 200-2004-03805
Task Order No. 3
January 17, 2005 -
SC&A Technical Review Summary: Overview of ORAUT-PROC-0002, Rev. 01: Use of Integrated Modules for Bioassay Analysis (IMBA) [131 KB (1 page)]
January 20, 2011 -
SC&A Technical Review Summary: Overview of OCAS-PR-003, Rev. 0 – Performing and Reporting Dose Reconstructions [149 KB (2 pages)]
January 20, 2011 -
SC&A Technical Review Summary: Overview of ORAUT-PROC-0004, Rev. 0: Scheduling Telephone Interviews [203 KB (1 page)]
January 20, 2011 -
SC&A Technical Review Summary: Overview of ORAUT-PROC-0005, Rev. 0: Performing Telephone Interviews [197 KB (1 page)]
January 20, 2011 -
SC&A Technical Review Summary: Overview of OCAS-IG-002, Rev. 0: Internal Dose Reconstruction Implementation Guideline [166 KB (2 pages)]
September 29, 2010 -
Supplement 1–REVISED [2 MB (199 pages)]
August 2007 -
Supplement 1 [1.0 MB (195 pages)]
June 8, 2006 -
SC&A Technical Review Summary: Overview of ORAUT-PROC-0080 – Conduct of Quality Assurance Audits [137 KB (1 page)]
June 8, 2006 -
Draft Report: Review of OCAS-IG-004: The Use of Data from Other Facilities in the Completion of Dose Reconstructions under the Energy Employees Occupational Illness Compensation Program Act [161 KB (25 pages)]
Contract No. 200-2009-28555
Task Order No. 3
March 30, 2009
-
-
Dow Chemical Corporation (Madison Site)
-
SC&A Draft: Focused Review of Appendix C, Revision 1 to TBD-6000, Dow Chemical Company (Madison Site) [463 KB (22 pages)]
Contract No. 211-2014-58081
SCA-TR-SP2015-0051, Revision 0
April 9, 2015 -
Draft: Evolution of Dose Reconstruction Approach at Dow Madison and Use of Surrogate Data [42 KB (7 pages)]
Contract No. 200-2009-28555
March 2010 -
Draft: Resolution of SC&A Findings on Appendix C (Dow Madison) of Battelle-TBD-6000 [31 KB (5 pages)]
Contract No. 200-2009-28555
March 2010 -
Draft: Focused Review of Appendix C to TBD-6000–Dow Chemical Company (Madison Site) [151 KB (18 pages)]
Contract No. 200-2009-28555
August 2009 -
Draft: Addendum 2. A Focused Review of Addendum 2 to the Dow Chemical – Madison Plant SEC Petition Evaluation Report [270 KB (22 pages)]
Contract No. 200-2004-03805
Task Order No. 5
September 2008 -
Draft: A Focused Review of Operations and Thorium Exposures at the Dow Chemical Company Madison Plant [862 KB (66 pages)]
Contract No. 200-2004-03805
Task Order No. 5
August 2007
-
-
Du Pont Deepwater Works
-
SC&A Draft: Resolution of SC&A Findings Developed during Review of “DCAS-TKBS-0006, Revision 00,” Rev. 0 [260 KB (10 pages)]
Contract No. 211-2014-58081
November 21, 2014 -
SC&A Draft: Response to NIOSH’s Commentary on Findings Regarding the Site Profile for Du Pont Deepwater Works, Rev. 0 [119 KB (16 pages)]
Contract No. 200-2009-28555
June 6, 2013 -
SC&A Memo: Du Pont Deepwater Works Issues Matrix [184 KB (2 pages)]
September 4, 2012 -
Draft: Review of the NIOSH Site Profile for Du Pont Chambers Works, Deepwater NJ [232 KB (23 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0035
August 2011
-
E
-
Electro Metallurgical Company
-
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-068, “Electro Metallurgical Company” [298 KB (22 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-068, “Electro Metallurgical Company” [641 KB (22 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-068, “Electro Metallurgical Company” [436 KB (24 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER068, Revision 0
January 30, 2024 -
Draft: Partial Review of the Revised NIOSH Petition Evaluation Report for the Electro-Metallurgical Corporation, Petition SEC-00136 [80 KB (12 pages)]
Contract No. 200-2009-28555
SCA-TR-SEC2012-0010, Revision 0 (Addendum to SCA-TR-SEC2010-0010)
February 21, 2012 -
Draft: Review of NIOSH Petition Evaluation Report for Petition SEC-00136 Dated July 21, 2009, Electro-Metallurgical Corporation [951 KB (67 pages)]
Contract No. 200-2009-28555
SCA-TR-SEC2010-0010, Rev. 1
May 2011
-
-
External Dosimetry
-
SC&A Draft: Commentary on Applications of Regression in External Dose Reconstruction (ORAUT-RPRT-0087) [912 KB (22 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR087, Revision 0
July 12, 2024 -
SC&A Presentation: Review of ORAUT-RPRT-0060, Revision 00, “Neutron Dose from Highly Enriched Uranium” [303 KB (25 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of ORAUT-RPRT-0071 on External Dose Coworker Methodology [312 KB (20 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Review of ORAUT-RPRT-0060, Revision 00, “Neutron Dose from Highly Enriched Uranium” [390 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR0060, Revision 0
January 31, 2024 -
SC&A Draft: Review of ORAUT-RPRT-0071 on External Dose Coworker Methodology [700 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR071, Revision 0
September 29, 2023 -
SC&A Presentation: SC&A’s Focused Evaluation of ORAUT-OTIB-0088, Revision 02, “External Dose Reconstruction” [362 KB (14 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Focused Review of ORAUT-OTIB-0088, Revision 02, “External Dose Reconstruction” [804 KB (10 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PR088, Revision 0
January 7, 2022 -
SC&A Presentation: SC&A’s Evaluation of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [322 KB (16 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A: ORAUT-OTIB-0088 External Dose Reconstruction [171 KB (5 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0088, Revision 00, “External Dose Reconstruction” [169 KB (8 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-PR001, Revision 0
January 8, 2019 -
SC&A: Audit of NIOSH Assessment of External Doses from Plutonium Fuel Pellets [1.4 MB (9 pages)]
Presentation for the December 4, 2018, Teleconference Meeting of the Advisory Board’s Work Group on Carborundum Company -
Advisory Board Presentation: ORAUT-OTIB-0020 Use of Coworker Dosimetry Data for External Dose Assignment [150 KB (10 pages)]
Presentation at the December 13-14, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Issues Resolution Matrix for ORAUT-OTIB-0020, “Use of Coworker Dosimetry Data for External Dose Assignment” [58 KB (4 pages)]
November 30, 2017 -
SC&A Draft: SC&A’s Evaluation of Resolution of Pantex Site Profile Issues in Revision 03 to Pantex External Dose Technical Base Document [97 KB (10 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP002, Revision 0
January 30, 2017 -
SC&A Draft: SC&A’s Review of the NIOSH Document Issued March 3, 2016, Titled, “Discussion of Ames Laboratory TBD Findings on External Dose” [97 KB (12 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SP007, Rev. 0
June 28, 2016 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-005, “Misinterpreted Application of the External Dose Factor for Hanford Dose Reconstructions” [117 KB (17 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0013, Revision 1
January 10, 2013 -
SC&A Draft Memo: Matrix Issues 22 and 23 Regarding Petitioner External Dose Issues [57 KB (9 pages)]
January 20, 2011 -
Draft: Review of External Dose for 32 Cases of Randomly Sampled Workers [514 KB (13 pages)]
January 15, 2007
-
F
-
Feed Materials Production Center (FMPC)
-
SC&A: Update on SEC-00250 Evaluation Report for the Y-12 Plant [264 KB (14 pages)]
Presentation at the December 8-9, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Review of Multiple Imputation Methods Applied to Censored Bioassay Datasets [135 KB (7 pages)]
June 3, 2020 -
SC&A: Fernald SEC Petition and Site Profile Review Status Update [124 KB (30 pages)]
Presentation at the August 22-23, 2018, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Analysis of Recycled Uranium Constituents at Fernald (1961–1972) [230 KB (6 pages)]
June 13, 2018 -
SC&A Draft: SC&A Clarifying Questions for Fernald Issues Matrix – Draft Working Document, Rev. 0 [391 KB (10 pages)]
Contract No. 211-2014-58081
February 22, 2018 -
SC&A: Issues Resolution Matrix for Fernald Site Profile and SEC Petition [381 KB (8 pages)]
August 9, 2017 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 5 [483 KB (71 pages)]
Contract No. 211-2014-58081
SCA-SP-IM2013-0045, Revision 5
August 9, 2017 -
SC&A Presentation: Fernald SEC Petition and Site Profile Review Status Update [119 KB (30 pages)]
Presentation at the August 23-24, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: A Draft Review of ORAUT-TKBS-0017-5, Revision 03, Feed Materials Production Center – Occupational Internal Dose [241 KB (29 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP004, Revision 0
July 6, 2017 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 4 [637 KB (51 pages)]
Contract No. 211-2014-58081
SCA-SP-IM2013-0045, Revision 4
May 18, 2016 -
SC&A Memo: Review of ORAUT-TKBS-0017-4, Rev. 3 [198 KB (7 pages)]
May 18, 2016 -
SC&A Draft: Draft Review of ORAUT-OTIB-0078, Revision 03, Internal Dosimetry Coworker Data for the Feed Materials Production Center [408 KB (23 pages)
Contract No. 211-2014-58081
SCA-TR-2016-SP004, Revision 0
May 12, 2016 -
SC&A Presentation: Review of Proposed NIOSH Methods for Reconstructing Thorium Doses at Fernald (1979–2006) [595 KB (35 pages)]
December 4, 2014 -
SC&A Memo: Response to NIOSH’s White Paper Dated November 26, 2014 (Regarding Radon Emissions from the K-65 Silos) [413 KB (15 pages)]
December 2, 2014 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment [884 KB (41 pages)]
Contract 211-2014-58081
SCA-SP-IM2013-0045, Revision 3
November 26, 2014 -
SC&A Draft White Paper: Review of Proposed NIOSH Methods for Reconstructing Thorium Doses at Fernald (1979-2006) [909 KB (50 pages)]
November 24, 2014 -
SC&A Working Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 2 [486 KB (40 pages)]
September 1, 2014 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 1 [485 KB (31 pages)]
Contract 200-2009-28555
SCA-SP-IM2013-0045, Rev. 1
April 13, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #REDACTED from the Fernald Environmental Management Project [2 MB (75 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED]
January 13, 2014 -
SC&A Working Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment [412 KB (26 pages)]
Contract Number 200-2009-28555
SCA-SP-IM2013-0045, Revision 0
October 16, 2013 -
SC&A Draft: Feasibility of Identifying Workers with Specific Plants/Areas of Fernald for Identification with Thorium Operations (1953–1967) [254 KB (28 pages)]
Contract Number 200-2009-28555
October 24, 2012 -
Presentation: Fernald SEC Petition Review [444 KB (13 pages)]
April 26, 2012 -
SC&A Memo: SC&A Comments on Slide 7 of NIOSH Presentation [132 KB (4 pages)]
April 17, 2012 -
SC&A Draft: Summary of SC&A Concerns Regarding the Latest Documents Posted by NIOSH to Complement Their White Papers on In-vivo Thorium Bioassay [176 KB (22 pages)]
Contract Number 200-2009-28555
April 6, 2012 -
SC&A Draft White Paper: Evaluation of the Impact of Recycled Thorium on Potential Worker Exposures at Fernald – An Interim Report [186 KB (20 pages)]
Contract Number 200-2009-28555, Rev.-00
February 8, 2012 -
SC&A Draft: SC&A’s Response to NIOSH’s Subgroup 10A Impact Analysis Dated November 1, 2011 [84 KB (13 pages)]
Contract No. 200-2009-28555, Rev.-00
February 6, 2012 -
SC&A Memo: SC&A Final Position on the Th-232 In-vivo Data Quality and Adequacy for FEMP Workers [71 KB (12 pages)]
January 30, 2012 -
SC&A Draft White Paper: SC&A Review of “NIOSH Evaluation of Fernald Subcontractor Bioassay Data, Revision 1” [479 KB (28 pages)]
Contract No.: 200-2009-28555
January 23, 2012 -
SC&A Draft White Paper: SC&A Position on In-Vivo Thorium Monitoring Completeness [260 KB (19 pages)]
Contract No.: 200-2009-28555
January 20, 2012 -
SC&A Draft: SC&A Technical Response to NIOSH Regarding Data Completeness of Proposed In-Vivo Thorium Coworker Model for Fernald [1.4 MB (46 pages)]
Contract No. 200-2009-28555, Rev. 0
August 4, 2011 -
SC&A Draft: SC&A’S Evaluation of NIOSH’s Response Dated March 31, 2011, to SC&A’s Second White Paper on Recycled (SEC Issue #3) at Fernald [107 KB (21 pages)]
Contract No. 200-2009-28555, Rev. 0
August 4, 2011 -
SC&A Draft: SC&A Response to NIOSH White Paper on FMPC Mobile In Vivo Radiation Monitoring Laboratory Calibration and Data Interpretation and Associated References [129 KB (15 pages)]
Contract No. 200-2009-28555, Rev. 0
August 3, 2011 -
SC&A Draft White Paper: SC&A Review of Issues Related to Reconstruction of Doses for Workers Exposed to Recycled Uranium at Fernald – A Second White Paper [519 KB (89 pages)]
Contract No. 200-2009-28555, Rev.-00
February 4, 2011 -
SC&A Draft White Paper: Evaluation of Occupational Environmental Exposure to Radon at the Fernald Environmental Management Project [1 MB (27 pages)]
Contract Number 200-2009-28555, Rev.-00
February 2, 2011 -
SC&A Draft White Paper: Focused Review of “Uncertainty and Variability in Historical Time-Weighted Average Exposure Data” (Davis and Strom 2008) and its Application in Dose Reconstruction Under EEOICPA [338 KB (35 pages)]
Contract No. 200-2009-28555, Rev.-01
February 2, 2011 -
SC&A Draft White Paper: Review of “Thorium In-Vivo Coworker Study for FEMP – A Proposed Attachment for ORAUT-TKBS-0017-5, Rev. 1” [491 KB (37 pages)]
Contract Number 200-2009-28555
June 28, 2010 -
SC&A Draft White Paper: Strategies to Investigate Allegations of Corrupt Bioassay Monitoring at Fernald [108 KB (17 pages)]
Contract Number 200-2009-28555
June 15, 2010 -
SC&A Draft White Paper: A Second White Paper Addressing Enhanced Radon Releases from the K-65 Silos at the Fernald Site [733 KB (26 pages)]
Contract No. 200-2009-28555
April 6, 2010 -
SC&A Draft White Paper: An Alternative Assessment of Radon Releases from K-65 Silos [5 MB (33 pages)]
Contract No. 200-2004-03805
November 21, 2008 -
Review of the Feed Materials Production Center (FMPC) Special Exposure Cohort (SEC) Petition-000046 and the NIOSH SEC Petition Evaluation Report Contract No. 200-2004-03805
Task Order No. 5
SCA-TR-TASK5-0056, Rev. 1
June 2007 -
Review of the NIOSH Site Profile for the Fernald Environmental Management Project (Feed Materials Production Center) [766 KB (170 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0010
November 10, 2006
-
G
-
General Electric Company
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021
-
-
General Steel Industries (GSI)
-
SC&A Memo: Reply to NIOSH Response to SC&A Observation 6 on DCAS-PER-057 [35 KB (2 pages)]f
August 17, 2021 -
SC&A Draft: DCAS-PER-080, Subtask 4: Review of Five Cases Reevaluated by NIOSH Using TBD-6000, Appendix BB, Revisions 2 and 3 [245 KB (24 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PER080-ST4, Revision 0
July 19, 2018 -
SC&A Memo: Reply to NIOSH Response Paper Regarding Appendix BB, Revision 2 [116 KB (3 pages)]
December 9, 2016 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB, Rev. 1, to TBD-6000 [314 KB (13 pages)]
November 13, 2015 -
SC&A: Review of NIOSH Response Paper: July 10, 2015 [256 KB (9 pages)]
Presentation from the November 3, 2015, Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB, Rev. 1, to TBD-6000 [248 KB (14 pages)]
September 25, 2015 -
SC&A Presentation: Review of Appendix BB, Rev. 1 – General Steel Industries [297 KB (8 pages)]
February 5, 2015, Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000 -
SC&A Presentation: Review of Two NIOSH Response Papers [261 KB (3 pages)]
February 5, 2015, Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000 -
SC&A Memo: Review of NIOSH’s Response Paper No. 2: “General Steel Industries Layout man Beta Skin Dose” [361 KB (22 pages)]
January 30, 2015 -
SC&A Memo: Review of “Site Profiles for Atomic Weapons Employers that Worked Uranium Metals Appendix BB – General Steel Industries,” Revision 1 [547 KB (16 pages)]
December 10, 2014 (replaces previous version dated October 29, 2014) -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [371 KB (29 pages)]
January 15, 2014 -
SC&A Memo: Update of Doses from External Exposure at General Steel Industries (GSI) [315 KB (8 pages)]
January 12, 2014 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [370 KB (29 pages)]
December 18, 2013 -
SC&A Memo: Review of Skin Dose Calculations for General Steel Industries [237 KB (8 pages)]
December 5, 2013 -
SC&A Memo: Alternative Calculations of Resuspension at GSI [186 KB (4 pages)]
October 22, 2013 -
SC&A Memo: Response to NIOSH White Paper: “Summary Dose Estimates for GSI,” [289 KB (12 pages)]
October 6, 2013 -
SC&A Draft: Supplementary Comments on Revision 01 of Battelle-TBD-6000, Rev. 0 [428 KB (34 pages)]
Contract No. 200-2009-28555
May 13, 2013 -
SC&A Presentation: Comparison of Updated NIOSH and SC&A Exposure Assessments at GSI [641 KB (13 pages)]
April 26, 2013 -
SC&A Memo: Review of NIOSH Estimates of Internal Exposures at GSI [35 KB (3 pages)]
April 24, 2013 -
SC&A Memo: Review of NIOSH Estimates of External Exposures at GSI [102 KB (6 pages)]
April 23, 2013 -
SC&A Presentation: Comparison of NIOSH and SC&A External Exposure Assessments at GSI [483 KB (9 pages)]
February 21, 2013 -
SC&A Memo: Response to NIOSH Report: “GSI Dose Estimation Comparison” [221 KB (11 pages)]
February 12, 2013 -
SC&A: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [210 KB (23 pages)]
November 26, 2012 -
SC&A Draft White Paper: Review of New Surrogate Data for Estimating Intakes of Uranium at General Steel Industries [217 KB (18 pages)]
Contract Number 200-2009-28555
November 25, 2012-
SC&A Draft White Paper: Review of the Use of Surrogate Data for Estimating Intakes of Uranium at General Steel Industries, Rev. 1 [133 KB (12 pages)]
Revised August 31, 2012 -
SC&A Presentation: Alternative Model for the Calculation of Uranium Intakes at GSI [252 KB (10 pages)]
August 28, 2012 -
SC&A Presentation: Review of the Use of Surrogate Data for Estimating Intakes of Uranium at General Steel Industries [97 KB (9 pages)]
August 28, 2012 -
SC&A Memo: Alternative Model for the Calculation of Uranium Intakes at GSI [218 KB (13 pages)]
July 25, 2012
-
-
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 (Second Update) [186 KB (21 pages)]
July 28, 2012 -
SC&A Memo: Reply to NIOSH Response to SC&A Memo Dated May 30, 2012 [31 KB (4 pages)]
June 11, 2012 -
SC&A Memo: Review of “Addendum to Dose Estimates for Betatron Operations White Paper” [80 KB (4 pages)]
March 25, 2012-
SC&A Draft White Paper: Response to “Battelle-TBD-6000 Appendix BB General Steel Industries: Dose Estimates for Betatron Operations” [352 KB (23 pages)]
Contract Number 200-2009-28555
March 12, 2012
-
-
SC&A Memo: Review of “NIOSH/DCAS Evaluation of the Response of Film Badges to High Energy Photons” [210 KB (8 pages)]
October 28, 2011 -
SC&A Draft: Update on the Use of Sealed Radioactive Sources at General Steel Industries [400 KB (25 pages)]
Contract No. 200-2009-28555
October 20, 2011 -
SC&A: Further Review of Film Badge Dosimetry Reports for GSI [33 KB (2 pages)]
March 9, 2009 -
SC&A: Response to NIOSH White Paper for GSI Appendix BB Review [72 KB (9 pages)]
November 8, 2008 -
SC&A Memo and Draft Report: Site Profiles for Atomic Weapons Employers That Worked Uranium and Thorium Metals – Appendix BB: General Steel Industries, Battelle-TBD- 6000, Appendix BB, Rev. 0 [1.7 MB (92 pages)]
Contract No. 200-2004-03805
Task Order No. 1
April 21, 2008 -
Dr. Robert Anigstein of Sanford Cohen & Associates (SC&A) Interviewing Former Employees of General Steel Industries (GSI) [378 KB (53 pages)]
October 9, 2007
-
-
Grand Junction Facilities
-
SC&A Presentation: DCAS-PER-047, Subtask 4: Review of Two Advisory Board-Selected Cases Reworked for the Evaluation of DCAS-PER-047 [315 KB (33 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo: Exposure from the Radon Calibration Chamber at the Grand Junction Facilities [287 KB (4 pages)]
July 19, 2022 -
SC&A Presentation: SC&A’s Review of ORAUT-TKBS-0060, revision 00, “Grand Junction Facilities” [384 KB (22 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Review of ORAUT-TKBS-0060, Revision 00, “Site Profile for Grand Junction Facilities” [144 KB (16 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR001, Revision 0
August 17, 2021 -
SC&A Memo: Revision 1 to Resolution of Finding 3 under SC&A’s Review of DCAS-PER-047 (GJOO) [172 KB (8 pages)]
August 14, 2017 -
SC&A Memo: Resolution of Finding 3 under SC&A’s Review of DCAS-PER-047 (GJOO) [152 KB (7 pages)]
June 22, 2017 -
SC&A Memo: SC&A Review of NIOSH July 2016 Finding Response [178 KB (9 pages]
September 27, 2016 -
SC&A Draft: Advisory Board and NIOSH Discussions on Grand Junction Facilities, Rev. 0 [759 KB (33 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC006, Rev. 0
May 17, 2016 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-47, “Grand Junction Operations Office”, Rev. 1 [1.7 MB (62 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2015-0093, Revision 1
February 10, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redacted] from the Hanford and the Grand Junction Operations Office [487 KB (20 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[Redacted]
January 27, 2015 -
SC&A Draft: Blind Dose Reconstruction of Case #[Redacted] from Hanford and the Grand Junction Operations Office [3 MB (80 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-[Redacted]
January 21, 2014
-
H
-
Hanford
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A: Review of NIOSH White Paper: “Assessment of Certain Special Exposure Cohort-Related Issues for the Hanford Site” Work Group Update [1.0 MB (16 pages)]
Presentation at the August 13, 2020, Advisory Board on Radiation and Worker Health Videoconference of the Hanford Work Group -
SC&A Memo: Review of NIOSH White Paper: “Assessment of Certain Special Exposure Cohort-Related Issues for the Hanford Site”
June 24, 2020 -
SC&A: Review of NIOSH White Paper “Assessment of Certain Special Exposure Cohort-Related Issues for the Hanford Site” [231 KB (16 pages)]
Presentation at the April 14, 2020, Teleconference Meeting of the Advisory Board Work Group on Hanford -
SC&A Memo: Review of “Site Profile for Pacific Northwest National Laboratory,” ORAUT-TKBS-0027, Revision 02, September 12, 2016 [58 KB (3 pages)]
February 1, 2018 -
SC&A Draft White Paper: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Hanford Site and Weldon Spring Plant, Rev. 0 [1 MB (42 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[Redact]
June 17, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] From the Hanford Site, Rev. 0 [266 KB (13 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015- CN[Redact]
May 12, 2015 -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redacted] from the Hanford and the Grand Junction Operations Office [487 KB (20 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[Redacted]
January 27, 2015 -
SC&A Draft: Summary of Site Expert Interviews Relating to the Hanford Special Exposure Cohort Issues [266 KB (13 pages)]
Contract No. 211-2014-58
SCA-SEC-IS2014-0058, Rev. 0
April 1, 2014 -
SC&A Draft: Blind Dose Reconstruction of Case #(Redacted) from Hanford and the Grand Junction Operations Office [3.5 MB (80 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-[Redacted]
January 21, 2014 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-005, “Misinterpreted Application of the External Dose Factor for Hanford Dose Reconstructions” [117 KB (17 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0013, Revision 1
January 10, 2013 -
SC&A Draft: Review of Hanford Petition SEC-00155 and the Associated NIOSH Evaluation Report [435 KB (88 pages)]
Contract No. 200-2009-28555
SCA-SEC-2012-0058, Revision 0
August 7, 2012 -
SC&A Draft: Review of Special Exposure Cohort Issues for the Hanford Site for the Period July 1, 1972, to December 31, 1990 (Volume I – Main Report, Revision 1) [495 KB (71 pages)]
Contract No. 200-2009-28555
September 2011 -
SC&A Draft: Review of Special Exposure Cohort Issues for the Hanford Site for the period July 1, 1972, to December 31, 1990 (Volume II – Appendices) [1.4 MB (175 pages)]
Contract No. 200-2009-28555
September 2011 -
SC&A Update: Remaining Hanford SEC Issues for SEC Petition SEC-00057-2 and SEC-00152 (Second Update) [73 KB (10 pages)]
August 19, 2011 -
SC&A Draft: Review of Data Used by NIOSH in Support of OCAS-RPT-001 for Assigning NP Rations in Behalf of the Hanford Site Single Pass Reactors [1 MB (7 pages)]
Contract No. 200-2004-03805
January 2009 -
SC&A Draft: Review of NIOSH Site Profile for the Hanford Site, Richland, Washington [4 MB (222 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0004
June 2005
-
-
Harshaw Chemical Company
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-034, “Harshaw Chemical Company TBD Revision” [362 KB (15 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR034, Revision 0
August 26, 2024
-
-
Hooker Electrochemical
-
SC&A Draft: SC&A Review of DCAS-TKBS-0009, Revision 03, for Hooker Electrochemical Company, Rev. 0 [110 KB (12 pages)]
Contract No. 211-2014-58081
November 21, 2016 -
SC&A Draft: DCAS-PER-038, Subtask 4 – Review of Three Advisory Board-Selected Cases Reassessed for the Hooker Electrochemical Company TBD Revisions, Rev. 0 [565 KB (25 pages)]
Contract No. 211-2014-58081
October 16, 2014 -
SC&A Presentation: Review of NIOSH’S Program Evaluation Report DCAS-PER-038, “Hooker Electrochemical TBD Revision” (SC&A Report Dated May 20, 2013) [353 KB (7 pages)]
(Presentation from the November 7, 2013, Teleconference Meeting of the Advisory Board’s Subcommittee for Procedures Review) -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-038, “Hooker Electrochemical TBD Revision” [247 KB (16 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0038, Rev. 0
May 20, 2013 -
SC&A Draft: Review of the NIOSH Technical Basis Document for the Hooker Electrochemical Company (DCAS-TKBS-0009) [272 KB (33 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2013-0034, Rev. 0
March 28, 2013 -
SC&A Draft Memo: Use of Surrogate Air Sampling Data at Hooker Electrochemical Company: Comparison of DCAS and SC&A Approaches [83 KB (7 pages)]
September 22, 2011 -
SC&A Draft: A Focused Review of the Hooker Electrochemical Company Petition Evaluation Report for SEC-00141 [245 KB (33 pages)]
SCA-SEC-2011-0018, Revision 0
January 2011 -
SC&A Draft: Review of the NIOSH Site Profile for the Hooker Electrochemical Company (Battelle-TBD-6001, Appendix AA) [186 KB (28 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2010-0034
September 2010
-
Huntington Pilot Plant
-
SC&A Presentation: SC&A’s Review of NIOSH’s SEC-00253 Petition Evaluation Report for the Reduction Pilot Plant, Huntington, WV [417 KB (23 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Review of NIOSH SEC-00253 Petition Evaluation Report for the Reduction Pilot Plant, Huntington, WV [564 KB (38 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC003, Revision 0
April 2, 2021 -
SC&A Draft: DCAS-PER-066, SUBTASK 4 Review of Impacted Cases Reworked for the Evaluation of Internal Intakes from the Huntington Pilot Plant [119KB (14 pages)]
Contract No. 211-2014-58081
October 11, 2016 -
SC&A Draft: DCAS-PER-033, Subtask 4 Review of Impacted Cases Reworked for the Evaluation of Internal Intakes and Shallow Dose from the Huntington Pilot Plant [386 KB (12 pages)]
Contract No. 200-2009-28555
January 15, 2014 -
SC&A Draft: OCAS-PER-025, Subtask 4 Review of One Impacted Case Reworked for the Evaluation of Shallow Dose from the Huntington Pilot Plant [372 KB (10 pages)]
Contract No. 200-2009-28555
December 5, 2013 -
SC&A: Huntington Pilot Plant Site Profile Review – Findings Matrix [102 KB (4 pages)]
November 18, 2013 -
SC&A Presentation: OCAS-PER-025 and DCAS-PER-033, Subtasks 1–3 Evaluation of Huntington Pilot Plant (HPP) TBD Revisions (SC&A Report Dated July 18, 2013) [387 KB (23 pages)]
(Presentation from the November 7, 2013, Teleconference Meeting of the Advisory Board’s Subcommittee for Procedures Review) -
SC&A Draft: A Review of NIOSH’s Program Evaluation Reports OCAS-PER-025 and OCAS-PER-033, “Huntington Pilot Plant TBD Revisions” [422 KB (16 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0082, Rev. 0
July 18, 2013 -
SC&A Draft: Review of the Revised Huntington Pilot Plant Site Profile [KB (25 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2013-0043
June 4, 2013 -
SC&A Draft: Preliminary Review of the Revised Site Profile for the Huntington Pilot Plant [65 KB (12 pages)]
Contract No. 200-2009-28555
March 21, 2013
-
I
-
Idaho National Laboratory
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A: Review of ORAUT-RPRT-0099 Evaluation of EBR-II and BORAX-IV for ORAUT-OTIB-0054 Applicability [132 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC001, Revision 0
January 15, 2021 -
SC&A: INL/ANL-W Site Profile BRS Status [256 KB (6 pages)]
Presentation at the July 16, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A: Reactor Characterization Studies [207 KB (5 pages)]
Presentation at the July 16, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A: Review of NIOSH Response to SC&A Draft Review of NIOSH’s Evaluation Report for Petition SEC-00219, Idaho National Laboratory: Burial Ground, 1952–1970 [1.5 MB (18 pages)]
Presentation at the July 16, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A: SEC-00238: Idaho National Laboratory – Chemical Processing Plant – Verification and Validation of Class Definition (1975–1980) [63 KB (10 pages)]
Presentation at the April 17, 2019, Advisory Board on Radiation and Worker Health Meeting -
SC&A: SEC-00219: Idaho National Laboratory – Chemical Processing Plant – Verification and Validation of Class Definition (1963–1970) [93 KB (14 pages)]
Presentation at the April 17, 2019, Advisory Board on Radiation and Worker Health Meeting -
SC&A: SEC-00219: Idaho National Laboratory – Chemical Processing Plant – Verification and Validation of Class Definition (1963 – 1970) [198 KB (15 pages)]
Presentation at the March 25, 2019, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A: SEC-00238: Idaho National Laboratory – Chemical Processing Plant – Verification and Validation of Class Definition (1975-1980) [125 KB (12 pages)]
Presentation at the March 25, 2019, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A Memo: Verification and Validation Proposal for the SEC-00238 83.14 Period at the Chemical Processing Plant (1975–1980) [438 KB (14 pages)]
February 25, 2019 -
SC&A Draft: Verification and Validation of Temporary Badges at the Chemical Processing Plant (1963-1970) [1.1 MB (21 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-SEC001, Revision 0
February 25, 2019 -
SC&A: Idaho National Laboratory SEC Petition-00219 Status Update [54 KB (12 pages)]
Presentation at the August 22-23, 2018, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Idaho National Laboratory SEC Petition-00238 Status Update [51 KB (9 pages)]
Presentation at the August 22-23, 2018, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Interim Status of Verification and Validation Activities for CPP (1963–1970) [389 KB (9 pages)]
July 26, 2018 -
SC&A Draft: Evaluation of Uranium Dose Reconstruction Methods at CPP (1953–1962) [381 KB (18 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC003, Revision 0
July 25, 2018 -
SC&A Draft: Review of External Dosimetry Records for the Chemical Processing Plant 83.14 SEC Period (1975–1980) [439 KB (27 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC002, Revision 0
February 20, 2018 -
SC&A Draft: Review of ORAUT-RPRT-0079, Revision 00, “Evaluation of Airborne Effluent Releases from Initial Engine Test No. 10 at the Idaho National Laboratory” [400 KB (29 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR010, Revision 0
October 9, 2017 -
NIOSH/DCAS: Idaho National Laboratory SEC Evaluation Report SEC-00238 [491 KB (17 pages)]
Presentation at the August 23-24, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Draft Review of Internal Alpha Exposure Potential at CPP Prior to 1963 [2 MB (52 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC008, Revision 0
July 10, 2017 -
SC&A Presentation: INL/ANL-W Reactor Prioritization & Other Reactor-Related Issues [501 KB (23 pages)]
Presentation from the May 16, 2017, Teleconference Meeting of the Advisory Board’s Work Group on Argonne National Laboratory-West/Idaho National Laboratory -
SC&A Draft: SC&A’s Evaluation of Cs-137/Sr-90, Fission and Activation Product, and Actinide Values Using ANL-W Monthly and Annual Waste Reports in Relationship to Assigning Intakes [457 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC002, Revision 0
January 20, 2017 -
SC&A Draft: SC&A’s Evaluation of Cs-137/Sr-90, Fission and Activation Product, and Actinide Values Using INL Monthly and Annual Waste Reports in Relationship to Assigning Intakes [5.8 MB (39 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC001, Revision 0
January 11, 2017 -
SC&A Draft: Response to NIOSH Reactor Analysis Plan and Consolidation of All Reactor Modeling Comments [1 MB (59 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC012, Revision 0
December 8, 2016 -
SC&A Memo: Verification and Validation (V&V) Plan for Temporary Badges at CPP (1963–1970), [180 KB (9 pages)]
September 29, 2016 -
SC&A Presentation: SC&A Status Update: SEC-00219 INL and SEC-00224 ANL-W [479 KB (58 pages)]
Presented at the August 9-10, 2016, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Integrated Status Report of Site Profile and SEC Issues Related to INL and ANL-W [690 KB (48 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC011, Revision 0
July 15, 2016 -
SC&A Draft: Evaluation of New Claims Filed Since the Summer of 2015 for Idaho National Laboratory – Executive Summary [98 KB (10 pages)
Contract No. 211-2014-58081
SCA-TR-2016-SEC004-Summary, Revision 0
July 6, 2016 -
SC&A Draft: SC&A’s Evaluation of CS-137/SR-90 Values and Actinides Using INL Waste Reports in Relationship to Assigning Intakes, Rev. 0 [520 KB (3 pages)
Contract No. 211-2014-58081
SCA-TR-2016-SEC007, Revision 0
June 24, 2016 -
SC&A Draft: INL SEC-00219 Reactor Prioritization for Evaluation of ORAUT-OTIB-0054 Applicability, Rev. 1 [435 KB (44 pages)
Contract No. 211-2014-58081
SCA-TR-2016-SEC002, Revision 1
June 10, 2016 -
SC&A Draft: Idaho National Laboratory Special Exposure Cohort SEC 0219 – Compilation of SC&A Review Issues, Comments, and Recommendations [490 KB (14 pages)
Updated March 13, 2016 -
SC&A Draft: INL SEC-00219 Reactor Prioritization for Evaluation of ORAUT-OTIB-0054 Applicability, Rev. 0 [265 KB (36 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC002, Revision 0
March 2, 2016 -
SC&A: Idaho National Laboratory Review of Issues, Comments, and Recommendations [557 KB (9 pages)]
February 23, 2016 -
SC&A: Evaluation of Claims with Supplemental Dosimetry Requests [5 MB (33 pages)]
January 12, 2016 -
SC&A Presentation: Status Update – SEC-00219 CPP Class Definition Requiring Evidence of External Dosimetry (1963–1974) and Evaluation of Areas and Times that NIOSH has Determined Doses are Reconstructable [509 KB (57 pages)]
Presented at the November 18-19, 2015, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Evaluation of Available Survey Data for the Central Facilities Area at Idaho National Laboratory [237 KB (15 pages)]
Presented at the November 10, 2015, Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Presentation: INL Test Reactor Area Nuclear Modeling [727 KB (32 pages)]
Presented at the November 10, 2015, Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Presentation: Review of NIOSH Strategy for Reconstructing Doses to Workers at Test Area North (TAN) [191 KB (26 pages)]
Presented at the November 10, 2015, Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Presentation: SC&A Evaluation of CPP Class Definition Requiring Evidence of External Dosimetry (1963–1974) [298 KB (23 pages)]
Presented at the November 10, 2015, Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Presentation: SC&A’s Evaluation of the NIOSH SEC ER Proposed Use of FAP Bioassay Indicator Radionuclides (in Conjunction with OTIB-54 and TBD-5) for Assessment of FAP and Actinide Intakes at INL [45 KB (17 pages)]
Presented at the November 10, 2015, Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Presentation: Evaluation of Internal Monitoring for Fission and Activation Products among INL Claimants (1949–1970) [287 KB (22 pages)]
Presented at the November 10, 2015, Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Presentation: SC&A Status Update – Evaluation of Areas and Times that NIOSH has Determined Doses are Reconstructable [448 KB (32 pages)]
Presented at the July 23, 2015, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: SC&A Evaluation of CPP Class Definition Requiring Evidence of External Dosimetry (1963–1974) [399 KB (22 pages)]
Presented at the July 23, 2015, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A Evaluation of Chemical Processing Plant Class Definition Requiring Evidence of External Dosimetry, Rev. 1 (1963–1974) [345 KB (7 pages)]
Contract Number 211-2014-58081
Revised July 15, 2015 -
SC&A Presentation: SC&A Status Update – Evaluation of Areas and Times that NIOSH has Determined Doses are Reconstructable [441 KB (28 pages)]
Presented at the July 8, 2015, Teleconference Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Draft: Interim Summary Report on the Evaluation of NIOSH’s Idaho National Laboratory SEC-00219 Petition Evaluation Report, Rev. 0 [773 KB (34 pages)]
Contract No. 211-2014-58081
July 6, 2015 -
SC&A Presentation: SC&A Evaluation of CPP Class Definition Requiring Evidence of External Dosimetry (1963–1974) [629 KB (35 pages)]
Revised July 3, 2015; presented at the July 8, 2015, Teleconference Meeting of the Advisory Board’s Work Group on Idaho National Laboratory -
SC&A Draft: SC&A Evaluation of Idaho Chemical Processing Plant Class Definition Requiring Evidence of External Dosimetry, Rev. 0 (1963–1974) [343 KB (6 pages)]
Contract Number 211-2014-58081
June 29, 2015 -
SC&A: Idaho National Laboratory Site Profile Update [400 KB (9 pages)]
July 29, 2014 -
SC&A Draft: Idaho National Laboratory (INL) Site Profile Review Status Update, Revision 1 [550 KB (75 pages)]
February 24, 2014 -
SC&A Draft: Idaho National Laboratory Site Profile Review Update–Supplement 1 [182 KB (29 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0005
December 30, 2008 -
SC&A Draft: Review of the NIOSH Site Profile for the Idaho National Laboratory, Idaho–Revision 1 [2 MB (250 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0005
January 25, 2006 -
SC&A Draft: Review of the NIOSH Site Profile for the Idaho National Laboratory, Idaho [2 MB (187 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0005
September 23, 2005
-
-
Internal Dosimetry
-
SC&A Presentation: Review of ORAUT-RPRT-0097 for Breathing Zone to General Area Air Concentration Ratios in Small Workrooms [249 KB (19 pages)]
Presentation at the August 7-8, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of ORAUT-RPRT-0084 for Two-Count Filter Method for Measurement of Thoron Progeny in Air [259 KB (13 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Evaluation of ORAUT-RPRT-0084, “Two-Count Filter Method for Measurement of Thoron Progeny in Air” [500 KB (10 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR084, Revision 0
February 7, 2024 -
SC&A Presentation: Review of ORAUT-RPRT-0097 for Breathing Zone to General Area Air Concentration Ratios in Small Workroom [441 KB (19 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: DCAS-PER-049 Subtask 4 – Internal Dose Issue [262 KB (12 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Evaluation of ORAUT-RPRT-0097, Revision 00, on Breathing Zone to General Area Air Concentration Ratios in Small Workrooms [473 KB (18 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR097, Revision 0
October 16, 2023 -
SC&A Memo: DCAS-PER-049 Subtask 4 – Internal Dose Issue [297 KB (4 pages)]
October 11, 2023 -
SC&A Memo: DCAS-PER-049 Subtask 4 – Internal Dose Followup [274 KB (7 pages)]
September 9, 2022 -
SC&A Presentation: Summary of Seven Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (89 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Review of Remaining Internal Dose Topics Related to the Evaluation of SEC-00235 at the Santa Susana Field Laboratory [347 KB (27 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-SEC002, Revision 0
February 20, 2019 -
SC&A Draft: SC&A Evaluation of NIOSH White Paper, “Method to Assess Internal Dose Using Gross Alpha, Beta, and Gamma Bioassay and Air Sampling at the Lawrence Berkeley National Laboratory” [161 KB (19 pages)]
Contract No. 211-2014-58081
SSCA-TR-2018-SP003, Revision 0
April 18, 2018 -
SC&A Draft: SC&A’s Evaluation of ORAUT-RPRT-0086, Revision 00, “Internal Dosimetry Coworker Data Completeness Test” [568 KB (8 pages)]
January 12, 2018 -
SC&A: Key Issues for Dose Reconstruction of Internal Dose for Subcontractors at Savannah River Site [569 KB (21 pages)]
Presentation at the December 13-14, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: A Draft Review of ORAUT-TKBS-0017-5, Revision 03, Feed Materials Production Center – Occupational Internal Dose [241 KB (29 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP004, Revision 0
July 6, 2017 -
SC&A Draft: Review of Petition Evaluation Report for SEC-00224, Argonne National Laboratory-West Regarding the Use of General Area Air Sampling for Internal Dose Assessment [15.4 MB (43 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SEC009, Revision 0
July 13, 2016 -
SC&A Draft: SC&A Review of NIOSH Responses to SC&A Comments on ORAUT-OTIB-0054, Rev. 1: Fission and Activation Product Assignment for Internal Dose-Related Gross Beta and Gross Gamma Analyses [757 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0084, Rev. 0
April 10, 2014 -
SC&A Draft: Review of “ORAUT-OTIB-0054, Fission and Activation Product Assignment for Internal Dose-Related Gross Beta and Gross Gamma Analyses, Rev. 1” [525 KB (29 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0084, Rev. 0
November 5, 2013 -
SC&A Technical Review Summary: Overview of ORAUT-OTIB-0022, Rev. 0: Guidance on Wound Modeling for Internal Dose Reconstruction [125 KB (1 page)]
January 20, 2011 -
SC&A Technical Review Summary: Overview of OCAS-IG-002, Rev. 0: Internal Dose Reconstruction Implementation Guideline [166 KB (2 pages)]
September 29, 2010 -
SC&A Draft: Feasibility of Internal Dose Reconstruction with Sufficient Accuracy at the Nevada Test Site During the Underground Testing Period: A Review of the NIOSH Position paper “NIOSH Review of the SEC-00084 Nevada Test Site Evaluation Report: Internal Dosimetry Issues Analysis” [946 KB (52 pages)]
Contract No. 200-2009-28555
January 2010 -
NIOSH/ORAU Report: ORAUT-OTIB-0022 Rev 0 – Guidance on Wound Modeling for Internal Dose Reconstruction [110 KB (9 pages)]
November 18, 2005
-
-
Iowa Ordnance Plant (IOP)
-
Final Draft: Review of NIOSH Site Profile for the Atomic Energy Operations at the Iowa Army Ammunition Plant (IAAP) [972 KB (93 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0009
June 2005
-
J
-
Joslyn Manufacturing and Supply Co.
-
SC&A Presentation: Evaluation of Uranium Processing Days for Joslyn Manufacturing: SCA-TR-SP2015-0050, Rev. 0 [895 KB (23 pages)]
Presentation at the February 14, 2024, Teleconference Meeting of the Advisory Board’s TBD 6000 Work Group -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix J to TBD-6000, Rev. 0 [231 KB (9 pages)]
July 6, 2015 -
SC&A Draft: Review of “Site Profiles for Atomic Weapons Employers that Worked Uranium Metals: Appendix J-Joslyn,” Rev. 0 [616 KB (33 pages)]
Contract Number 211-2014-58081
SCA-TR-SP2015-0050
May 12, 2015 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Petition Evaluation Report for Joslyn SEC Petition 00200 [304 KB (6 pages)]
December 18, 2013 -
SC&A Draft: Supplementary Comments on Revision 01 of Battelle-TBD-6000, Rev. 0 [428 KB (34 pages)]
Contract No. 200-2009-28555
May 13, 2013 -
SC&A Draft: Review of the Joslyn Manufacturing and Supply Company Petition Evaluation Report for Special Exposure Cohort (SEC) Petition 00200 [235 KB (39 pages)]
Contract No. 200-2009-28555
SCA-TR-SEC 2013-0069
March 28, 2013
-
K
-
Kansas City Plant
-
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: SC&A Review of Site Profile for the Kansas City Plant, ORAUT-TKBS-0031, Revision 01 [76 KB (6 pages)]
January 30, 2017 -
SC&A Memo: Evaluation of NIOSH’s KCP Dosimetry Database Validation and Verification (V&V) of November 12, 2015 [40 KB (2 pages)]
November 16, 2015 -
SC&A: Kansas City Plant Special Exposure Cohort (SEC 210) Issues Matrix [341 KB (29 pages)]
October 29, 2015 -
SC&A Memo: Evaluation of NIOSH’s Mg-Th, Tritium, and Ni-63 Example Dose Reconstruction [49 KB (2 pages)]
October 16, 2015 -
SC&A Memo: Outline of Radiological and Radiography Procedures and Standards at the KCP [108 KB (2 pages)]
September 30, 2015 -
SC&A Memo: Status of KCP Outstanding Issues [104 KB (3 pages)]
July 2, 2015 -
SC&A Draft: Review of NIOSH’s White Paper “Internal Exposures to Thorium and its Progeny at the Kansas City Plant during Mg-Th Machining,” Rev. 1 [550 KB (21 pages)]
Contract Number 211-2014-58081
May 12, 2015 -
SC&A Draft: Review of NIOSH’s White Paper “Internal Exposures to Thorium and its Progeny at the Kansas City Plant during Mg-Th Machining,” Rev. 0 [544 KB (21 pages)]
Contract Number 211-2014-58081
May 6, 2015 -
SC&A Memo: SC&A’s Evaluation and Closure of KCP SEC Matrix Issues 11 and 12; Neutron Dose [165 KB (2 pages)]
April 21, 2015 -
SC&A Memo: SC&A’s Evaluation of NIOSH’s January 2015 Response to KCP SEC Matrix Issues 7, 15, 17, 18, and 20 [189 KB (5 pages)]
April 20, 2015 -
SC&A Draft: Review of Internal Exposures to Thorium and its Progeny at the Kansas City Plant During MG-TH Machining Operations [350 KB (14 pages)]
Contract No. 211-2014-58081
August 15, 2014 -
SC&A Draft: Review of Internal Exposures to Uranium at the Kansas City Plant Using TBD-6000 and ORAUT-OTIB-0070 as Surrogate Data [496 KB (17 pages)]
Contract No. 211-2014-580
July 24, 2014 -
SC&A Draft: Review of the NIOSH Site Profile for the Kansas City Plant, Revision 1 [873 KB (58 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2012-0006
November 13, 2013 -
SC&A Draft: Review of the NIOSH Site Profile for the Kansas City Plant [331 KB (29 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2012-0006
September 6, 2012
-
L
-
Lawrence Berkeley National Laboratory (LBNL)
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: SC&A Evaluation of NIOSH White Paper, “Method to Assess Internal Dose Using Gross Alpha, Beta, and Gamma Bioassay and Air Sampling at the Lawrence Berkeley National Laboratory” [161 KB (19 pages)]
Contract No. 211-2014-58081
SSCA-TR-2018-SP003, Revision 0
April 18, 2018 -
SC&A Memo: NIOSH December 4, 2013, Response to SC&A Comments [237 KB (3 pages)]
February 4, 2014 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #2, Rev. 0 [93 KB (14 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #3, Rev. 0 [123 KB (5 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issues #6, #7, and #8, Rev. 0 [160 KB (17 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #9, Rev. 0 [32 KB (5 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A’s Issues Matrix for the Lawrence Berkeley National Laboratory Site Profile Technical Basis Document [149 KB (17 pages)]
January 26, 2012 -
SC&A Draft: Review of the NIOSH Site Profile for Lawrence Berkeley National Laboratory [1.5 MB (83 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2010-0002
January 22, 2010
-
-
Lawrence Livermore National Laboratory (LLNL)
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: SC&A’s Focused Evaluation of LLNL ORAUT-TKBS-0035-5, Revision 03, for TBD-5 Issue Resolution [112 KB (15 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC004, Revision 0
February 7, 2017 -
Working Draft: SC&A Review of the Evaluation Report for the Lawrence Livermore National Laboratory (LLNL) Special Exposure Cohort: In-Vivo Counting Time Period Issue [90 KB (10 pages)]
Contract No. 200-2004-03805
April 11, 2008 -
Draft: SC&A Review of the Lawrence Livermore National Laboratory Site Profile [1 MB (169 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0018, Revision 1
August 2007
-
-
Linde Ceramics Plant (including Tonawanda Laboratory)
-
SC&A Presentation: Summary of Four Document Reviews Approved by the Subcommittee for Procedure Reviews [860 KB (71 pages)]
Presentation at the April 17, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-042, “Linde Ceramics Plant TBD Revision” [505 KB (25 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0088, Rev. 0
August 19, 2014 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-042, “Linde Ceramics Plant TBD Revision”
Contract No. 211-2014-58081
SCA-TR-PR2014-0003, Rev. 0
April 10, 2014 -
SC&A Draft: A Pre-Evaluation of DCAS-PER-041, DCAS-PER-042, DCAS-PER-043, DCAS-PER-044, and DCAS-PER-045 for a Formal Audit by SC&A [318 KB (9 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0003, Rev. 0
April 10, 2014 -
SC&A Memo: Ashland Oil – Linde Waste [39 KB (4 pages)]
March 26, 2013 -
SC&A Draft: Linde Utility Tunnel-Related TBD Issues [157 KB (13 pages)]
Contract No. 200-2009-28555
February 10, 2012 -
SC&A Draft Memo: Follow-up to the October 11, 2011 Action Item Report – Linde Tunnel Issue [20 KB (1 page)]
October 17, 2011 -
SC&A Draft: Review of the Linde Ceramics Plant Special Exposure Cohort (SEC) Petition 00154 and the NIOSH SEC Petition Evaluation Report [114 KB (23 pages)]
Contract No. 200-2009-28555
SCA-TR-SEC2011-0006
July 11, 2011 -
SC&A Preliminary Review of “Evaluation of Radon Concentrations in the Utility Tunnels at Linde Ceramics” [108 KB (6 pages)]
October 13, 2010 -
SC&A Draft: Review of the Linde Ceramics Plant Special Exposure Cohort (SEC) Petition 00107 and the NIOSH SEC Petition Evaluation Report–Addendum [50 KB (9 pages)]
Contract No. 200-2009-28555
SCA-SEC-TASK5-0006
September 2009 -
SC&A Draft: Assessment of the Disposition of SC&A’s Linde Site Profile Review Issues in Response to SEC Petitioner Concerns [499 KB (74 pages)]
Contract No. 200-2009-28555
August 2009 -
SC&A Draft: Review of the Linde Ceramics Plant Special Exposure Cohort (SEC) Petition 00107 and the NIOSH SEC Petition Evaluation Report [1.6 MB (57 pages)]
Contract No. 200-2009-28555
Task Order No. 5
SCA-SEC-TASK5-0006
June 18, 2009 -
SC&A Draft: Review of the NIOSH Site Profile for the Linde Ceramics Plant and Tonawanda Laboratory, Tonawanda, New York [1.43 MB (126 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0014
July 14, 2006
-
-
Los Alamos National Laboratory (LANL)
-
SC&A Draft: SC&A Review of Remaining Internal Dose Issues for the LANL SEC-0109 Addendum Period (1996–2000) [1 MB (103 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-SEC002, Revision 0
April 12, 2024 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: SC&A Review of “NIOSH Response to NTS Report NC ID 484 (LANL)” [120 KB (12 pages)]
June 10, 2019 -
NIOSH/ORAU: NIOSH Response to NTS Report NC ID 484 (LANL) [251 KB (31 pages)]
March 26, 2019 -
SC&A Draft: SC&A’s Review of White Paper, “NIOSH Response to SC&A’s Review of the SEC-00109 LANL Addendum” [228 KB (24 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC005, Revision 2
January 9, 2019 -
NIOSH/DCAS/SC&A: NIOSH and SC&A Reviews of Issues with SEC-00109 LANL Addendum [781 KB (20 pages)]
Presentation at the December 12-13, 2018, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A Review of White Paper, “NIOSH Response to SC&A’s Review of the SEC-00109 LANL Addendum” [516 KB (24 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC005, Revision 1
November 16, 2018 -
SC&A Presentation: Review of SEC Petition Evaluation Report Addendum Los Alamos National Laboratory [146 KB (8 pages)]
Presentation at the August 23-24, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of SEC Petition Evaluation Report Addendum on Los Alamos National Laboratory [135 KB (8 pages)]
Presentation at the August 15, 2017, Teleconference Meeting of the Advisory Board’s Work Group on Los Alamos National Laboratory (LANL) -
SC&A Memo: Remaining Site Profile (TBD) Issues [63 KB (5 pages)]
March 10, 2017 -
SC&A Draft: Review of Responsiveness to Worker Comments for Los Alamos National Laboratory, Rev. 2 [2 MB (219 pages)]
June 11, 2014 -
SC&A Presentation: Review of NIOSH Responsiveness to Worker Comments for Los Alamos National Laboratory [130 KB (13 pages)]
Teleconference Meeting of the Advisory Board’s Work Group on Worker Outreach
June 5, 2014 -
SC&A Draft Report to the Subcommittee on Dose Reconstruction: Summary of Findings Matrix (10th–13th Sets: RFP/LANL Cases) [459 KB (32 pages)]
November 21, 2012 -
SC&A Memo: Comments Regarding Cerro Grande White Paper (Revision 01, April 4, 2011) [40 KB (3 pages)]
May 30, 2012 -
SC&A Draft: Review of NIOSH’s Evaluation Report for Los Alamos National Laboratory Special Exposure Cohort Petition SEC-00109: Preliminary Issues – Availability of Bioassay Records and Adequacy of In-vivo Dosimetry [438 KB (53 pages)]
Contract No. 200-2009-28555
SCA-TR-SEC2010-0004, Revision 0
April 2010 -
SC&A Draft: Los Alamos National Laboratory Site Profile Review [2.1 MB (214 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0011
August 2006
-
M
-
Mallinckrodt Chemical Co., Destrehan St. Plant
-
SC&A Presentation: A Review of NIOSH’s Program Evaluation Report DCAS-PER-040, “Mallinckrodt TBD Revisions” [285 KB (22 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: A Review of NIOSH’s Program Evaluation Report DCAS-PER-040, “Mallinckrodt TBD Revisions” [445 KB (22 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-040, “Mallinckrodt TBD Revisions” [663 KB (21 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR040, Revision 1
September 21, 2023 -
Review of NIOSH Site Profile for Mallinckrodt Chemical Company, St. Louis Downtown Site, St. Louis, MO. [420 KB (102 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0002
January 31, 2005
-
-
Medina Modification Center (formerly known as Medina Facility)
-
SC&A Presentation: SC&A’s Review of DCAS-PER-087, “Clarksville and Medina Modification Centers” [343 KB (27 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-087, “Clarksville and Medina Modification Centers” [446 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PER087, Revision 1
September 28, 2021 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-087, “Clarksville and Medina Modification Centers” [176 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PER087, Revision 0
August 24, 2021 -
SC&A Draft: Review of the Site Profile for the Clarksville and Medina Plants [164 KB (32 pages)]
Contract No. 200-Clarksville Facility
SCA-TR-SP2012-0007, Rev. 0
February 22, 2012
-
-
Metallurgical Laboratory
-
SC&A Draft: A Pre-Evaluation of DCAS-PER-041, DCAS-PER-042, DCAS-PER-043, DCAS-PER-044, and DCAS-PER-045 for a Formal Audit by SC&A [318 KB (9 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0003, Rev. 0
April 10, 2014 -
Draft: Assessment of the Metallurgical Laboratory Special Exposure Cohort (SEC) Petition-00135 with Special Emphasis on the 250-Workday Criterion [3 MB (50 pages)]
Contract No. 200-2009-28555
Task Order No. 5
SCA-SEC-TASK5-0007
June 2009
-
-
Metals and Controls Corp.
-
SC&A Memo: NIOSH Use of “Extreme Conservatism”: SC&A’s Perspective [398 KB (13 pages)]
January 26, 2024 -
SC&A Presentation: Review of Overall NIOSH Response and SEC Issues under Consideration for M&C [300 KB (31 pages)]
Presentation at the December 6, 2023, Teleconference Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A Draft: SC&A Review of Overall NIOSH Response to SC&A’s Supplemental Review of M&C Work Group Issues as of November 2023 [686 KB (51 pages)]
Revision 0 PC-1
Contract No. 75D30119C04183
November 22, 2023 -
Advisory Board Presentation: Update — Metals and Controls Corp. (M&C) Work Group Review of SEC-Related Issues [971 KB (22 pages)]
Presentation at the August 16, 2023, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of NIOSH Response to SC&A’s Supplemental Review of M&C [440 KB (15 pages)]
Presentation at the July 13, 2023, Teleconference Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A Presentation: Supplemental M&C Data Sufficiency, Adequacy, and Precedent Discussion [572 KB (24 pages)]
Presentation at the May 12, 2023, Teleconference Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A Presentation: Update on M&C Exposure Pathway Modeling [667 KB (23 pages)]
Presentation at the May 12, 2023, Teleconference Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A Draft: SC&A Review of NIOSH Response to SC&A’s Supplemental Review of M&C Work Group Issues [392 KB (18 pages)]
Contract No. 75D30119C04183
Revision 0
April 25, 2023 -
SC&A Draft: Supplemental Review of M&C Work Group Issues [850 KB (45 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-SEC002, Revision 0
August 22, 2022 -
SC&A Draft: SC&A Commentary on NIOSH’s Approach to Quantifying Outdoor and Indoor Airborne Dust Loadings [273 KB (23 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC005, Revision 0
October 25, 2021 -
SC&A Draft: Metals and Controls Corp. Exposure Pathway Evaluation [735 KB (34 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC004, Revision 0
October 25, 2021 -
SC&A: Reply to NIOSH “Metals and Controls Corp. Thorium and Welding Exposure Model” [314 KB (16 pages)]
Presentation at the September 2, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A Memo: Reply to NIOSH “Metals and Controls Corp. Thorium and Welding Exposure Model” [153 KB (11 pages)]
July 8, 2020 -
SC&A: Issues Resolution Roadmap for Metals and Controls Corporation [620 KB (14 pages)]
Presentation at the April 13, 2020, Teleconference Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A: Issues Resolution Roadmap for Metals and Controls Corporation SEC Petition-00236 [371 KB (45 pages)]
March 12, 2020 -
SC&A Memo: Review of NIOSH “Metals and Controls Corp. SEC-00236 Petitioner Concerns” [97 KB (9 pages)]
December 30, 2019 -
SC&A Memo: Review of NIOSH’s “Metals and Controls Corp. Thorium and Welding Exposure Model” [83 KB (8 pages)]
July 26, 2019 -
SC&A: SC&A Status Report for the Metals and Controls Corporation SEC Petition Evaluation of Petition 236 [345 KB (24 pages)]
Presentation at the December 12-13, 2018, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A Draft Review of NIOSH’s White Paper Dated October 24, 2018 [267 KB (22 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC007, Revision 0
November 29, 2018 -
SC&A: SC&A Draft Review of NIOSH’S White Paper Dated October 24, 2018 [133 KB (11 pages)]
November 20, 2018 -
SC&A Memo: Response to NIOSH White Paper on Metals and Controls Corp. Subsurface Exposure Model, dated April 23, 2018 [158 KB (8 pages)]
September 17, 2018 -
SC&A: Summary of SC&A’s review of SEC Petition Evaluation Report SEC-00236 [254 KB (22 pages)]
Presented at the May 3, 2018, Meeting of the Advisory Board’s Work Group on Metals and Controls Corp. -
SC&A Draft: Review of SEC Petition Evaluation Report SEC-00236 Metals and Controls Corporation [413 KB (61 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SEC001, Revision 0
February 12, 2018
-
-
Mound Plant
-
SC&A Presentation: A Review of ORAUT-OTIB-0087 for Extremity Doses for Mound Exposures to Plutonium-238 [246 KB (20 pages)]
Presentation at the June 21, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of ORAUT-OTIB-0087 for Extremity Doses for Mound Exposures to Plutonium-238 [867 KB (21 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR087, Revision 0
April 21, 2023 -
SC&A Draft: SC&A Commentary on NIOSH’s Approach to Quantifying Outdoor and Indoor Airborne Dust Loadings [273 KB (23 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC005, Revision 0
October 25, 2021 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: Application of NOCTS Data 2021 [333 KB (8 pages)]
July 29, 2021 -
SC&A Memo: Clarification of Mound Database Use [32 KB (2 pages)]
November 29, 2016 -
SC&A Draft: Review of Remaining Site Profile Issues for Mound Laboratory Related to Current Technical Basis Documents [174 KB (17 pages)]
February 11, 2016 -
SC&A Draft: Mound Laboratory Site Potential Exposures to Stable Metal Tritides, Revision 1 [1 MB (92 pages)]
July 06, 2012 -
SC&A Memo: Reply to NIOSH Comments on SC&A’s Thorium Report of May 2, 2012 [37 KB (5 pages)]
June 1, 2012 -
SC&A Draft: Mound Laboratory Site Potential Exposures to Stable Metal Tritides [1.5 MB (92 pages)]
May 24, 2012 -
SC&A’s Evaluation of NIOSH’s April 2012 Mound Laboratory Th-232 White Paper [40 KB (5 pages)]
May 2012 -
Memo: Interview with Former Mound HVAC Worker Conducted April 5, 2012 [52 KB (5 pages)]
April 19, 2012 -
SC&A Mound SEC Issues Matrix for SEC Petition SEC-00090 [132 KB (24 pages)]
November 2, 2011 -
SC&A Draft Memo: SC&A’s Response to NIOSH Evaluation of Remaining Neutron Issues at the Mound Laboratory [31 KB (4 pages)]
October 4, 2011 -
SC&A Memo: Comments on NIOSH Evaluation of NTA Neutron Film Fading at Mound [97 KB (5 pages)]
January 20, 2011 -
SC&A Preliminary Draft for the Mound Working Group Review: Mound Internal Data Adequacy and Completeness Issue Status Report [42 KB (7 pages)]
October 4, 2010 -
Draft Review of NIOSH Site Profile for the Mound Laboratory Site [783 KB (192 pages)]
July 16, 2006
-
N
-
Nevada Test Site
-
SC&A Memo: SC&A Comments on NIOSH White Paper, “A Discussion of Completeness in Co-Exposure Models” [339 KB (7 pages)]
October 17, 2023 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: Summary and Status of Nevada Test Site Matrix Comments [73 KB (8 pages)]
July 15, 2020 -
SC&A Draft: Comments on NIOSH’s “Determination of NTS Beta-to-Photon Ratio and Beta Dose for 1963–1966, and Determination of an Extremity to Whole-Body Ratio Using Quantile Regression and Imputation Methods” (2017) [414 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SP002, Revision 0 PC-1
June 11, 2018 -
SC&A Draft: Nevada Test Site: Review of Site Profile Comment 26 [933 KB (47 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP003, Revision 0
June 12, 2017 -
SC&A Presentation: Response to NIOSH’s Review of SC&A’s Nevada Test Site Resuspension Issues Status Report [1.3 MB (31 pages)]
January 5, 2017 -
SC&A Memo: NTS Site Profile Matrix Comments and December 2016 Update by SC&A [75 KB (5 pages)]
December 29, 2016 -
SC&A Draft: Response to NIOSH’s Review of SC&A’s Nevada Test Site Resuspension Issues Status Report [380 KB (38 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SP010, Revision 0
December 21, 2016 -
SC&A Memo: SC&A’s Position on Comment 8 – Resuspension Issues at the Nevada Test Site [53 KB (5 pages)]
December 16, 2016 -
SC&A Draft: Status Report on Resuspension Issues at the Nevada Test Site [1 MB (44 pages)]
Contract No. 211-2014-58081
July 21, 2015 -
SC&A Draft: Update of the Nevada Test Site (NTS) Issue Resolution Matrix Based on the SC&A Review of the NIOSH Site Profile for the Nevada Test Site [272 KB (5248pages)]
Contract No. 200-2009-28555
December 14, 2012 -
SC&A Draft: Feasibility of Internal Dose Reconstruction with Sufficient Accuracy at the Nevada Test Site During the Underground Testing Period: A Review of the NIOSH Position paper “NIOSH Review of the SEC-00084 Nevada Test Site Evaluation Report: Internal Dosimetry Issues Analysis” [946 KB (52 pages)]
Contract No. 200-2009-28555
January 2010 -
Draft: Review of the NIOSH Site Profile for the Nevada Test Site [2 MB (159 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0006
December 13, 2005
-
-
NIOSH-IREP
-
Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-008, Modification of NIOSH-IREP Cancer Risk Model: Effect of “Combined” Lung Model on Non-Compensable Lung Cancer Claims (OCAS-PER-008) [414 KB (26 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2010-0008, Revision 0
December 2010
-
-
Norton Co.
-
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (95 pages)]
Presentation at the April 19-20, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Norton Dose Reconstruction Template Revisions (DCAS-PER-059, Subtask 4) [228 KB (15 pages)]
Presentation at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Norton Dose Reconstruction Template Revisions (DCAS-PER-059, Subtask 4) [333 KB (15 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-059, “Norton Company” [887 KB (24 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR002, Rev. 0
May 22, 2017 -
Draft: A Focused Review of the Norton Company SEC Petition Evaluation Report SEC-00173 Concerning the Use of ORAUT-OTIB-0070 for the Reconstruction of Doses from Residual/Post-Operational Contamination [739 KB (14 pages)]
Contract No. 200-2009-28555
July 2011
-
-
Nuclear Materials and Equipment Corp. (NUMEC)–Apollo
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: Review of Revision 03 to the Site Profile for Nuclear Materials and Equipment Corporation, Apollo and Parks Township, Pennsylvania [272 KB (35 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP001, Revision 0
February 6, 2017 -
SC&A Draft: SC&A Assessment of Selected NIOSH Responses to SC&A NUMEC Site Profile Findings [352 KB (14 pages)]
August 14, 2015 -
SC&A Draft: Review of the NIOSH Site Profile for Nuclear Materials and Equipment Parks Township and Apollo Sites [834 KB (74 pages)]
April 19, 2013
-
-
Nuclear Materials and Equipment Corp. (NUMEC)–Parks Township
-
SC&A Draft: Review of Revision 03 to the Site Profile for Nuclear Materials and Equipment Corporation, Apollo and Parks Township, Pennsylvania [272 KB (35 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP001, Revision 0
February 6, 2017 -
SC&A Draft: SC&A Assessment of Selected NIOSH Responses to SC&A NUMEC Site Profile Findings [352 KB (14 pages)]
August 14, 2015 -
SC&A Draft: Review of the NIOSH Site Profile for Nuclear Materials and Equipment Parks Township and Apollo Sites [834 KB (74 pages)]
April 19, 2013
-
-
Nuclear Metals, Inc.
-
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-070, “Nuclear Metals Inc.” [320 KB (28 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-070, “Nuclear Metals Inc.” [394 KB (28 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-070, “Nuclear Metals Inc.” [800 KB (18 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER070, Revision 0
January 30, 2024
-
O
-
Oak Ridge Gaseous Diffusion Plant (K-25 Site)
-
SC&A Presentation: Review of ORAUT-RPRT-0060, Revision 00, “Neutron Dose from Highly Enriched Uranium” [258 KB (25 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: Review of NIOSH February 2020 Response to SC&A (September 2019) on Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants [246 KB (16 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SP001, Revision 0
July 13, 2020 -
SC&A: ORAUT-OTIB-0026 External Coworker Dosimetry Data for the K-25 Site [178 KB (6 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Review of NIOSH’s White Paper, “Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants” [139 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SP002, Revision 0
September 16, 2019 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-011: K-25 TBD and TIB Revisions [441 KB (34 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0080, Rev. 0
April 24, 2013 -
SC&A: K-25 Site, Oak Ridge Gaseous Diffusion Plant Issues Matrix [261 KB (12 pages)]
October 8, 2012 -
Draft: SC&A Review of the K-25 Gaseous Diffusion Plant Site Profile [3 MB (192 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0017
May 2007
-
-
Oak Ridge National Laboratory (ORNL or X-10)
-
SC&A Draft: SC&A’s Evaluation of Revision 01 of ORAUT-RPRT-0090: Exotic Radionuclides Produced by Oak Ridge National Laboratory [1 MB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-SEC001, Revision 0
February 13, 2024 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A: Review of NIOSH Response to SC&A Comments on ORAUT-RPRT-0090 [707 KB (61 pages)]
Presentation at the June 30, 2021, Teleconference Meeting of the Advisory Board Work Group on Oak Ridge National Laboratory (ORNL/X-10) -
SC&A: Update on SEC-00250 Evaluation Report for the Y-12 Plant [264 KB (14 pages)]
Presentation at the December 8-9, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Issues Resolution Matrix for ORAUT-OTIB-0034, Revision 01, “Internal Dosimetry Coworker Data for X-10” [355 KB (5 pages)]
March 26, 2018 -
SC&A Memo: Responses to 17th Set Blind Remaining Issues [55 KB (2 pages)]
November 24, 2015 -
SC&A Draft: Blind Dose Reconstruction of Case #[REDACTED] from the Y-12 National Security Complex and the X-10 Oak Ridge National Laboratory, Rev. 0 [4 MB (122 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED]
February 24, 2014 -
Draft: Oak Ridge National Laboratory Site Profile Review [1.36 MB (116 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0013
September 29, 2006
-
P
-
Pacific Northwest National Laboratory (PNNL)
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Memo: Review of “Site Profile for Pacific Northwest National Laboratory,” ORAUT-TKBS-0027, Revision 02, September 12, 2016 [58 KB (3 pages)]
February 1, 2018
-
-
Pacific Proving Grounds (PPG)
-
SC&A Draft: Issues Resolution Matrix for Pacific Proving Grounds Site Profile [87 KB (10 pages)]
Contract No. 211-2014-58081
September 6, 2017 -
SC&A Draft: Review of the Summary Site Profile for the Pacific Proving Grounds, Revision 1, July 11, 2016 [123 KB (16 pages)]
Contract No. 211-2014-58081
December 21, 2016 -
SC&A Draft: Review of the Summary Site Profile for the Pacific Proving Grounds, Rev. 1 [2 MB (65 pages)]
Contract No. 200-2009-28555
November 5, 2013
-
-
Paducah Gaseous Diffusion Plant
-
SC&A Presentation: Review of ORAUT-RPRT-0060, Revision 00, “Neutron Dose from Highly Enriched Uranium” [258 KB (25 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: DCAS-PER-049 Subtask 4 – Internal Dose Issue [262 KB (12 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo: DCAS-PER-049 Subtask 4 – Internal Dose Followup [274 KB (7 pages)]
September 9, 2022 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: Review of NIOSH February 2020 Response to SC&A (September 2019) on Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants [246 KB (16 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SP001, Revision 0
July 13, 2020 -
SC&A: Paducah Gaseous Diffusion Plant Issues Matrix [368 KB (16 pages)]
October 8, 2012 -
Draft: Paducah Gaseous Diffusion Plant Site Profile Review [2.42 MB (154 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0016
October 20, 2006
-
-
Pantex Plant
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: Pantex Plant Site Profile Issues and Resolution [302 KB (44 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-SP001, Revision 0
February 12, 2018 -
SC&A Draft: SC&A’s Evaluation of Resolution of Pantex Site Profile Issues in Revision 03 to Pantex External Dose Technical Base Document [97 KB (10 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP002, Revision 0
January 30, 2017 -
SC&A: Pantex TBD and OTIB-0086 Neutron NTA Film Correction Factor Issues [62 KB (4 pages)]
October 19, 2016 -
SC&A Draft: SC&A’s Evaluation of Revisions to Pantex Technical Basis Documents Relevant to Site Profile and SEC Issues [594 KB (15 pages)]
February 23, 2016 -
SC&A Draft: SC&A’s Evaluation of the Pantex External Coworker Model, Rev. 0 [311 KB (17 pages)]
Contract No. 211-2014-58081
September 23, 2015 -
SC&A Working Draft: Pantex Plant Site Profile Issues Matrix Draft Preliminary SC&A Assessment, Rev. 4 [522 KB (38 pages)]
Contract No. 211-2014-58081
September 29, 2014 -
SC&A Working Draft: Pantex Plant Site Profile Issues Matrix Draft Preliminary SC&A Assessment, Rev. 3 [507 KB (38 pages)]
Contract No. 200-2009-28555
October 8, 2013 -
SC&A Draft: Review of Proposed NIOSH Dose Reconstruction Methods for Uranium and Thorium at Pantex Plant during 1951–1957 and 1984–1991, Rev. 1 [719 KB (26 pages)]
Contract No. 200-2009-28555, Rev. 2
June 26, 2013 -
SC&A Draft: Review of Proposed NIOSH Dose Reconstruction Methods for Uranium and Thorium at Pantex Plant during 1951–1957 and 1984–1991, Rev. 1 [717 KB (26 pages)]
Contract No. 200-2009-28555, Rev. 1
June 13, 2013 -
SC&A Draft: Pantex Plant Site Expert Interview Summary [193 KB (40 pages)]
Contract No. 200-2009-28555
July 25, 2011 -
SC&A Draft: A Paper Study of the SEC Petition and NIOSH Evaluation Report for Pantex [220 KB (30 pages)]
Contract No. 200-2009-28555
March 2009 -
SC&A Draft: Pantex Plant Site Profile Review [1.1 MB (136 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0019
July 2008
-
-
Peek Street Facility
-
SC&A Presentation: Peek Street Facility Case Reviews [452 KB (20 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo: SC&A Comments on NIOSH’s Responses to SCA-TR-2019-PR004, “Peek Street Facility” [547 KB (7 pages)]
September 8, 2022 -
SC&A: Dose Reconstruction Template Review for the Peek Street Facility, Schenectady, New York [281 KB (15 pages)]
Presentation at the February 18, 2021, Teleconference Meeting of the Subcommittee for Procedures Review -
SC&A Draft: Dose Reconstruction Template Review for the Peek Street Facility, Schenectady, New York [211 KB (31 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-PR004, Revision 0
January 29, 2019
-
-
Pinellas Plant
-
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-079, “Pinellas Plant” [369 KB (18 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PR079, Revision 0
September 26, 2024 -
SC&A Presentation: SC&A Status Update on Comments Matrix, Review of Petitioner Submissions, and Other Matters [385 KB (12 pages)]
Presentation at the August 7-8, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Interim Review of Pinellas SEC-00256 Petition Evaluation Report [336 KB (43 pages)]
Presentation at the December 7, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Interim Review of Pinellas SEC-00256 Petition Evaluation Report [747 KB (43 pages)]
Presentation at the November 20, 2023, Teleconference Meeting of the Advisory Board’s Work Group on the Pinellas Plant -
SC&A Draft: Interim SC&A Review of the SEC Petition Evaluation Report for Petition SEC-00256: Pinellas Plant [2 MB (88 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-SEC001, Revision 0
June 16, 2023 -
SC&A Presentation: Status of Pinellas Plant SEC-00256 Evaluation Report Review [346 KB (41 pages)]
Presentation at the December 8, 2022, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Pinellas Site Profile Review [40 KB (13 pages)]
Presented at the August 9-10, 2016, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Pinellas Site Profile Review – Status Report and Action Items Following the Work Group Meeting Held on March 1, 2016 [71 KB (19 pages)]
Presented at the March 23-24, 2016, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Issue Resolution Matrix for Pinellas Plant [460 KB (16 pages)
Updated March 15, 2016 -
SC&A Memo: Stiver/Katz Notes on Pinellas Plant Technical Call [173 KB (2 pages)
March 4, 2016 -
SC&A Draft: Review of Proposed Stable Metal Tritide Dose Reconstruction Methodology at Pinellas [2 MB (41 pages)
February 4, 2016 -
SC&A Memo: Draft Pinellas Issues Matrix Issue #5: Gamma LOD for RTG Pu-238 Generators [506 KB (8 pages)
February 3, 2016 -
SC&A Draft: Pinellas Issue Matrix – Updated [112 KB (9 pages)
January 6, 2016 -
Draft: Review of the NIOSH Site Profile for the Pinellas Plant Site [485 KB (71 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0015
September 15, 2006
-
-
Piqua Organic Moderated Reactor
-
SC&A Draft: Review of NIOSH White Paper, “The Neutron Exposure at the Piqua Organic Moderated Reactor,” Dated March 3, 2011 [44 KB (9 pages)]
Contract No. 200-2009-28555
April 21, 2011
-
-
Portsmouth Gaseous Diffusion Plant
-
SC&A Presentation: Review of ORAUT-OTIB-0040, Revision 00 PC-1, “External Coworker Dosimetry Data for the Portsmouth Gaseous Diffusion Plant” [333 KB (30 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of ORAUT-OTIB-0036, Revision 00, “Internal Coworker Bioassay Data for Portsmouth Gaseous Diffusion Plant” [271 KB (27 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of ORAUT-RPRT-0060, Revision 00, “Neutron Dose from Highly Enriched Uranium” [258 KB (25 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of ORAUT-OTIB-0040 for External Coworker Dosimetry Data for the Portsmouth Gaseous Diffusion Plant [356 KB (13 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR040, Revision 0
May 29, 2024 -
SC&A Draft: A Review of ORAUT-OTIB-0036 for Internal Coworker Bioassay Data for the Portsmouth Gaseous Diffusion Plant [392 KB (13 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR036, Revision 0
May 29, 2024 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: Review of NIOSH February 2020 Response to SC&A (September 2019) on Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants [246 KB (16 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SP001, Revision 0
July 13, 2020 -
SC&A Draft: SC&A’s Review of NIOSH’s White Paper, “Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants” [139 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SP002, Revision 0
September 16, 2019 -
SC&A: Draft Site Profile Issues Matrix for Portsmouth [290 KB (9 pages)]
October 8, 2012 -
SC&A Memo and Draft Report: Review of the NIOSH Site Profile for the Portsmouth Gaseous Diffusion Plant [4 MB (90 pages)]
Contract No. 200-2004-03805
Task Order No. 1
February 2008 -
SC&A Attachment 1: Summary of Site Expert Interviews [245 KB (32 pages)]
Task Order No. 1-0020
April 18, 2008
-
-
Program Evaluation Reports (PERs)
-
SC&A Presentation: Summary of Six Document Reviews Approved by the Subcommittee for Procedure Reviews [691 KB (73 pages)]
Presentation at the December 5, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-072, “Seymour Specialty Wiring Company” [291 KB (28 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-070, “Nuclear Metals Inc.” [320 KB (28 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-068, “Electro Metallurgical Company” [298 KB (22 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: A Review of NIOSH’s Program Evaluation Report DCAS-PER-040, “Mallinckrodt TBD Revisions” [285 KB (22 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-079, “Pinellas Plant” [369 KB (18 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PR079, Revision 0
September 26, 2024 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-075, "Battelle Memorial Institute TBD Revision" [824 KB (24 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PER075, Revision 0
September 26, 2024 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-036, “Blockson TBD Revision” [402 KB (16 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PR036, Revision 0
September 11, 2024 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-039, “Baker Perkins TBD Revision” [403 KB (14 pages)]
Contract No. 75D30124F19451
Document No. SCA-TR-2024-PR039, Revision 0
September 4, 2024 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-034, “Harshaw Chemical Company TBD Revision” [362 KB (15 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR034, Revision 0
August 26, 2024 -
SC&A Presentation: Summary of Eight Document Reviews Approved by the Subcommittee for Procedure Reviews [317 KB (42 pages)]
Presentation at the August 7-8, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Summary of Four Document Reviews Approved by the Subcommittee for Procedure Reviews [860 KB (71 pages)]
Presentation at the April 17, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation Handout: Sites with Unreviewed DR Methodology Templates and Reports [463 KB (5 pages)]
Presentation Handout at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation Handout: SPR-Approved Document Reviews [479 KB (7 pages)]
Presentation Handout at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Program Evaluation Reports Considered to Not Need a Review [277 KB (19 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-072, “Seymour Specialty Wiring Company” [441 KB (28 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-068, “Electro Metallurgical Company” [641 KB (22 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-070, “Nuclear Metals Inc.” [394 KB (28 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: DCAS-PER-047, Subtask 4: Review of Two Advisory Board-Selected Cases Reworked for the Evaluation of DCAS-PER-047 [315 KB (33 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-070, “Nuclear Metals Inc.” [800 KB (18 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER070, Revision 0
January 30, 2024 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-068, “Electro Metallurgical Company” [436 KB (24 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER068, Revision 0
January 30, 2024 -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-067, “Allegheny Ludlum Appendix Q Revision” [283 KB (27 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of DCAS PER-083 for the Weldon Spring Plant, Weldon Spring, MO [502 KB (26 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of DCAS-PER-051 for the Weldon Spring Plant, Weldon Spring, MO [534 KB (25 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: A Review of NIOSH’s Program Evaluation Report DCAS-PER-040, “Mallinckrodt TBD Revisions” [445 KB (22 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo: DCAS-PER-049 Subtask 4 – Internal Dose Issue [297 KB (4 pages)]
October 11, 2023 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-051, “Weldon Spring Plant” [516 KB (18 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER051, Revision 1
September 21, 2023 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-083, “Weldon Spring Plant TBD Revision” [570 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER083, Revision 1
September 22, 2023 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-040, “Mallinckrodt TBD Revisions” [663 KB (21 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR040, Revision 1
September 21, 2023 -
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [422 KB (71 pages)]
Presentation at the August 16, 2023, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Reply to NIOSH Response to SC&A Review Comments on PER-073 [489 KB (4 pages)]
June 7, 2023 -
SC&A Handout: SCPR-Approved Document Reviews [193 KB (5 pages)]
Handout at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-093, “Texas City Chemicals” [243 KB (12 pages)]
Presentation at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: SC&A’s Review of DCAS-PER-092 for the Weldon Spring Plant, Weldon Spring, MO [292 KB (24 pages)]
Presentation at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Memo: DCAS-PER-049 Subtask 4 – Internal Dose Followup [274 KB (7 pages)]
September 9, 2022 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-092, “Weldon Spring Plant” [397 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PER092, Revision 0
June 9, 2022 -
SC&A Handout: Carryover Items from February 2019 and 2021 SCPR Meetings [661 KB (8 pages)]
Discussion/Background Paper at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of ORAUT-OTIB-0052 Revisions (DCAS-PER-062, Subtask 4) [571 KB (24 pages)]
Presentation at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Norton Dose Reconstruction Template Revisions (DCAS-PER-059, Subtask 4) [228 KB (15 pages)]
Presentation at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-093, “Texas City Chemicals, TBD Rev. 01” [586 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PER093, Revision 0
May 5, 2022 -
SC&A Presentation: Summary of Seven Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (89 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Norton Dose Reconstruction Template Revisions (DCAS-PER-059, Subtask 4) [333 KB (15 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of the Advisory Board-Selected Case Reworked for the Evaluation of Aluminum Company of America – Pennsylvania Technical Basis Document Revisions (DCAS-PER-063, Subtask 4) [268 KB (16 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: SC&A’s Review of DCAS-PER-087, “Clarksville and Medina Modification Centers” [343 KB (27 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of Anaconda Technical Basis Document Revisions (DCAS-PER-065, Subtask 4) [309 KB (17 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-087, “Clarksville and Medina Modification Centers” [446 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PER087, Revision 1
September 28, 2021 -
SC&A Draft: DCAS-PER-080, Subtask 4: Review of Five Cases Reevaluated by NIOSH Using TBD-6000, Appendix BB, Revisions 2 and 3 [245 KB (24 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PER080-ST4, Revision 0
July 19, 2018 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-073, “Birdsboro Steel and Foundry Company” [188 KB (25 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PR003, Revision 0
June 7, 2018 -
SC&A Draft: Review of NIOSH’s Program Evaluation Report DCAS-PER-062, “ORAUT-OTIB-0052” [120 KB (15 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PR002, Revision 0
May 31, 2018 -
SC&A Memo: Revision 1 to Resolution of Finding 3 under SC&A’s Review of DCAS-PER-047 (GJOO) [172 KB (8 pages)]
August 14, 2017 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-061: Bridgeport Brass Company [234 KB (27 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR005, Revision 0
July 10, 2017 -
SC&A Draft: Review of NIOSH’s Program Evaluation Report DCAS-PER-065, “Anaconda” [638 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR004, Revision 0
June 15, 2017 -
SC&A Memo: Resolution of Finding 3 under SC&A’s Review of DCAS-PER-047 (GJOO) [152 KB (7 pages)]
June 22, 2017 -
SC&A Draft: DCAS-PER-066, SUBTASK 4 Review of Impacted Cases Reworked for the Evaluation of Internal Intakes from the Huntington Pilot Plant [119KB (14 pages)]
Contract No. 211-2014-58081
October 11, 2016 -
SC&A Memo: Program Evaluation Reports and Technical Guidance Documents Not Tasked for SC&A’s Review [267 KB (8 pages)]
February 23, 2016 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-055, “TBD-6000 Revision, 9/12/2014,” Rev. 0 [577 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-PER2015-0097
July 24, 2015 -
SC&A Memo: Review of NIOSH’s Response to DCAS-PER-045 Findings [503 KB (12 pages)]
March 24, 2015 -
SC&A Memo: Program Evaluation Reports (PERs) Not Tasked for SC&A’s Review [207 KB (4 pages)]
February 20, 2015 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-47, “Grand Junction Operations Office”, Rev. 1 [1.7 MB (62 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2015-0093, Revision 1
February 10, 2015 -
SC&A Draft: DCAS-PER-038, Subtask 4 – Review of Three Advisory Board-Selected Cases Reassessed for the Hooker Electrochemical Company TBD Revisions, Rev. 0 [565 KB (25 pages)]
Contract No. 211-2014-58081
October 16, 2014 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-052, “Westinghouse Nuclear Fuels Division” Rev. 0 [409 KB (15 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0094
October 6, 2014 -
SC&A Memo: Current Status of Program Evaluation Report (PER) Reviews [197 KB (8 pages)]
August 25, 2014 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-045, “Aliquippa Forge TBD Revision” [1.2 MB (33 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0092, Rev. 0
August 20, 2014 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-042, “Linde Ceramics Plant TBD Revision” [505 KB (25 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0088, Rev. 0
August 19, 2014 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-043, “Internal Dosimetry Organ, External Dosimetry Organ, and IREP Model Selection by ICD-9 Code Revision” [408 KB (16 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0089, Rev. 0
August 18, 2014 -
SC&A Draft: A Pre-Evaluation of DCAS-PER-041, DCAS-PER-042, DCAS-PER-043, DCAS-PER-044, and DCAS-PER-045 for a Formal Audit by SC&A [318 KB (9 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0003, Rev. 0
April 10, 2014 -
SC&A Draft: OCAS-PER-030, Subtask 4 Review of Impacted Cases Reworked for the Evaluation of External Ambient Doses and Internal Intakes from the Savannah River Site, Rev. 0 [341 KB (12 pages)]
Contract No. 211-2014-58081
March 19, 2014 -
SC&A Draft: OCAS-PER-009, Subtask 4, Review of Three Cases Reworked for the Evaluation of Lymphomas Affected by Changes to Internal and/or External Target Organs [1 MB (30 pages)]
Contract No. 200-2009-28555
February 4, 2014 -
SC&A Draft: SC&A Draft: DCAS-PER-033, Subtask 4 Review of Impacted Cases Reworked for the Evaluation of Internal Intakes and Shallow Dose from the Huntington Pilot Plant [386 KB (12 pages)]
Contract No. 200-2009-28555
January 15, 2014 -
SC&A Draft: OCAS-PER-025, Subtask 4 Review of One Impacted Case Reworked for the Evaluation of Shallow Dose from the Huntington Pilot Plant [372 KB (10 pages)]
Contract No. 200-2009-28555
December 5, 2013 -
SC&A Memo: PER-014 Review Findings #1 and #3 [342 KB (7 pages)]
November 12, 2013 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Reports OCAS-PER-025 and OCAS-PER-033, “Huntington Pilot Plant TBD Revisions” [422 KB (16 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0082, Rev. 0
July 18, 2013 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report “OCAS-PER-030, SRS TBD Revisions” [389 KB (19 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0030, Rev. 0
July 1, 2013 -
SC&A Draft: OCAS-PER-014, Subtask 4: Review of Select Cases Reworked for the Evaluation for Construction Trade Worker Coworker Dose, Rev. 1 [613 KB (44 pages)]
Contract No. 200-2009-28555
April 30, 2013 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-011: K-25 TBD and TIB Revisions [441 KB (34 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0080, Rev. 0
April 24, 2013 -
SC&A Draft: OCAS-PER-012, Subtask 4, Review of Nine Advisory Board Selected Cases Reworked for the Evaluation of Highly Insoluble Plutonium Compounds [232 KB (46 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2012-0012, Revision 0
July 20, 2012 -
Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-014, Construction Trades Workers [228 KB (21 pages)]
Contract No. 200-2009-28555
SCA-TR–PR2012-0014, Rev. 0
March 2012 -
Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-008, Modification of NIOSH-IREP Cancer Risk Model: Effect of “Combined” Lung Model on Non-Compensable Lung Cancer Claims (OCAS-PER-008) [414 KB (26 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2010-0008, Revision 0
December 2010 -
Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-012, “Evaluation of Highly Insoluble Plutonium Compounds,” Rev. 0 [414 KB (26 pages)]
Contract No. 200-2004-03805
SCA-TR-PR2010-0001, Rev. 0
March 18, 2010 -
Draft: A Preliminary Review of NIOSH’s Program Evaluation Report OCAS-PER-020, “Blockson TBD Revision” [294 KB (25 pages)]
Contract No. 200-2009-28555
SCA-TR-TASK3-0012, Rev. 0
March 2009 -
Draft: A Preliminary Review of NIOSH’s Evaluation Report OCAS-PER-009, Target Organs for Lymphoma [809 KB (44 pages)]
Contract No. 200-2004-03805
Task Order No. 3
SCA-TR-TASK3-0008
June 2008
-
R
-
Reduction Pilot Plant
-
SC&A Presentation: SC&A’s Review of NIOSH’s SEC-00253 Petition Evaluation Report for the Reduction Pilot Plant, Huntington, WV [417 KB (23 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: SC&A’s Review of NIOSH’s SEC-00253 Petition Evaluation Report for the Reduction Pilot Plant, Huntington, WV [452 KB (16 pages)]
Presentation at the February 17, 2022, Teleconference Meeting of the Uranium Refining Atomic Weapons Employers (AWEs) Work Group -
SC&A Draft: SC&A’s Review of NIOSH SEC-00253 Petition Evaluation Report for the Reduction Pilot Plant, Huntington, WV [564 KB (38 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC003, Revision 0
April 2, 2021
-
-
Rocky Flats Plant
-
SC&A Presentation: SC&A’s Review of Rocky Flats Plant Technical Basis Document Revisions and Issues [391 KB (21 pages)]
Presentation at the October 4, 2022, Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats Plant -
SC&A Draft: Review of 2019–2020 Revisions to Rocky Flats Plant Technical Basis Documents [689 KB (60 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SP001, Revision 0
December 3, 2021 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Memo: OCAS-TIB-0014 Finding from Subcommittee for Procedure Reviews [41 KB (1 page)]
March 2, 2017 -
SC&A Memo: Responses to 17th Set Blind Remaining Issues [55 KB (2 pages)]
November 24, 2015 -
SC&A Draft: Review of NIOSH’s White Paper: Assessment of Sealed Radioactive Sources, and Fission and Activation Products as Radiological Exposure Sources in the Rocky Flats Plant Critical Mass Laboratory (Building 886 Cluster), Rev. 0 [382 KB (8 pages)]
Contract Number 211-2014-58081
July 8, 2015 -
SC&A Draft: Comparison of SC&A’S Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 1 [893 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACT], Revision 1
April 16, 2015 -
SC&A Draft: Comparison of SC&A’S Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 0 [601 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACT]
February 13, 2015 -
SC&A Draft: Response to NIOSH White Paper: “Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues” dated May 30, 2014, Rev. 0 [590 KB (37 pages)]
Contract No. 211-2014-58081
September 18, 2014 -
SC&A Memo: Response to NIOSH Regarding the Existence of Mg-Th Alloy at Rocky Flats Plant [108 KB (4 pages)]
September 11, 2014 -
SC&A Draft: SC&A’s Dose Reconstruction of Case #[Redacted] from the Rocky Flats Plant [1 MB (41 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[Redacted]
January 13, 2014 -
SC&A Draft: Review of Part II, Rocky Flats Tritium Dose Assignment for 1973, Attachment A [658 KB (21 pages)]
Contract No. 200-2009-28555
December 11, 2013 -
SC&A Memo: Update of SC&A’s Review of RFP Documents for Data Falsification [254 KB (3 pages)]
October 9, 2013 -
SC&A Draft White Paper: Focused Review of “Follow-up Efforts on SEC-00192 RFP Tritium Issues” [649 KB (15 pages)]
Contract Number 200-2009-28555
September 10, 2013 -
SC&A Memo: Review of RFP Data Falsification Issue [142 KB (1 page)]
September 4, 2013 -
SC&A Draft Report to the Subcommittee on Dose Reconstruction: Summary of Findings Matrix (10th–13th Sets: RFP/LANL Cases) [459 KB (32 pages)]
November 21, 2012 -
SC&A Draft: Preliminary Draft sections of SC&A’s Rocky Flats SEC Petition Evaluation Report Review report sections for Work Group review and discussions:
-
Draft: Review of the Rocky Flats Plant Special Exposure Cohort Petition, SEC-00030. Volume 1: Main Report [1.5 MB (231 pages)]
April 5, 2007 -
Draft: Review of the Rocky Flats Plant Special Exposure Cohort Petition, SEC-00030. Volume 2: Attachments [11 MB (537 pages)]
April 27, 2007 -
Revised Draft: Supplemental Report on Neutron Doses at Rocky Flats, 1952 to 1970 [606 KB (91 pages)]
April 30, 2007 -
Draft: Second Supplemental Report on the Rocky Flats SEC Petition [566 KB (66 pages)]
June 1, 2007 -
Draft: Other Radionuclides (including Thorium) [152 KB (21 pages)]
February 15, 2007 -
Draft: Data Completeness Evaluation [96 KB (10 pages)]
February 15, 2007 -
Draft: Completeness of Records for 1969 and 1970 [509 KB (20 pages)]
February 15, 2007 -
Draft: Safety Concerns [205 KB (35 pages)]
February 15, 2007 -
Draft: Data Integrity Examples Analysis–This document is currently being updated and will be reposted once the update is complete.
-
Draft: Logbook Analysis [106 KB (18 pages)]
January 18, 2007-
Draft: Logbook Analysis Attachments 1-5 [957 KB (89 pages)]
January 18, 2007
-
-
Draft: Review of External Dose for 32 Cases of Randomly Sampled Workers [514 KB (13 pages)]
January 15, 2007
-
-
Draft: Rocky Flats Plant Site Profile Review [2.7 MB (263 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0008
December 8, 2005
-
S
-
Sandia National Laboratories–Albuquerque, NM
-
SC&A Presentation: SC&A Review of SEC-00188 Evaluation Report Addendum 2 for Sandia National Laboratories – Albuquerque [254 KB (13 pages)]
Presentation at the August 17-18, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: SC&A Review of SEC-00188 Evaluation Report Addendum 2 for Sandia National Laboratories – Albuquerque [336 KB (13 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: SC&A Review of SEC-00188 Evaluation Report Addendum 2 for Sandia National Laboratories – Albuquerque [503 KB (25 pages)]
Presentation at the March 3, 2022, Teleconference Meeting of the Advisory Board’s Work Group on Sandia National Laboratories -
SC&A Draft: Reply to NIOSH’s Response to SC&A’s Review of the Sandia National Laboratories – Albuquerque SEC-00188 Addendum 2 Evaluation Report [451 KB (25 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC006, Revision 0
January 3, 2022 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: Review of SEC Petition Evaluation Report: Petition SEC-00188, Addendum 2 (1977–2011), for Sandia National Laboratories – Albuquerque [1 MB (63 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SEC004, Revision 0
December 4, 2020 -
Draft: Review of Site Profile for Sandia National Laboratories in Albuquerque, New Mexico, and the Tonopah Test Range in Nevada [421 KB (82 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0022
February 12, 2009
-
-
Sandia National Laboratories-Livermore (Livermore, CA)
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: Review of the Summary Site Profile for the Sandia National Laboratories at Livermore, California [345 KB (73 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2012-0003, Revision 0
October 2, 2012
-
-
Savannah River Site
-
SC&A Presentation: Evaluation of Feasibility and Utility of Subcontractor Exposure Potential Comparison [200 KB (9 pages)]
Presentation at the September 25, 2024, Teleconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) -
SC&A Presentation: Savannah River Site SEC (1991–2007): Response to NIOSH Reviews [369 KB (30 pages)]
Presentation at the September 25, 2024, Teleconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) -
SC&A Presentation: Summary of Eight Document Reviews Approved by the Subcommittee for Procedure Reviews [317 KB (42 pages)]
Presentation at the August 7-8, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A Evaluation of Feasibility and Utility of Subcontractor Exposure Potential Comparison [1 MB (14 pages)]
Contract No. 75D30119C04183
Revision 0
December 18, 2023 -
SC&A Draft: Review of NIOSH’s Response to SC&A’s Focused Review of ORAUT-RPRT-0092, 1991–2007 [2 MB (33 pages)]
Contract No. 75D30119C04183
Revision 0
December 15, 2023 -
SC&A Presentation: Savannah River Site (SRS) SEC Update (1991–2007) [507 KB (20 pages)]
Presentation at the August 16, 2023, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Status of SRS Work Group Review of Savannah River Site SEC Evaluation for Subcontractor CTWs, 1991–2007 [358 KB (14 pages)]
Presentation at the April 19-20, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Initial Response to NIOSH Response Paper for ORAUT-RPRT-0092, Savannah River Site, 1991–2007 [446 KB (18 pages)]
Presentation at the March 22, 2023, Teleconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) -
SC&A Draft: Focused Review of ORAUT-RPRT-0092, Revision 00, and Remaining Petition SEC-00103 Evaluation Report Period: 1991–2007 [1 MB (76 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-SEC001, Revision 0
April 22, 2022 -
SC&A Memo: SRS Trivalent Bioassay Variability Status and Recommendation [593 KB (12 pages)]
April 21, 2022 -
SC&A Memo: March 2022 Update of Issues Matrix for the SRS SEC Petition and Petition Evaluation Report [1.6 MB (24 pages)]
March 11, 2022 -
SC&A Presentation: Summary of Five Approved Document Reviews by the Subcommittee for Procedure Reviews [253 KB (18 pages)]
Presentation at the December 8-9, 2021, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: Application of NOCTS Data 2021 [333 KB (8 pages)]
July 29, 2021 -
SC&A: Summary Position on Dose Reconstruction Feasibility for Subcontractor Construction Trade Workers at Savannah River Site [251 KB (10 pages)]
Presentation at the April 14-15, 2021, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: SC&A Summary Position on Dose Reconstruction Feasibility for Subcontractor Construction Trade Workers at SRS [673 KB (17 pages)]
Presentation at the March 23, 2021, Teleconference Meeting of the Advisory Board’s Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) Joint Work Group -
SC&A: Summary of Key Issues Concerning Internal Monitoring Completeness and Representativeness for SRS Subcontractor Construction Trade Workers [1.3 MB (41 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SEC002, Revision 0
March 8, 2021 -
SC&A: SC&A Findings on ORAUT-RPRT-0092: Bioassay Data for Subcontracted Construction Trade Workers at SRS [694 KB (21 pages)]
Presentation at the December 8-9, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Recent SC&A & NIOSH Positions on ORAUT-RPRT-0091 re: Savannah River Site Americium-241 Source Terms (1971–1999) [605 KB (10 pages)]
Presentation at the November 17 and 20, 2020, Videoconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) -
SC&A: Review of Multiple Imputation Methods Applied to Censored Bioassay Datasets [641 KB (15 pages)]
Presentation at the November 17 and 20, 2020, Videoconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) -
SC&A: SC&A Summary Position on Observed Trivalent Bioassay Variability [359 KB (16 pages)]
Presentation at the November 17 and 20, 2020, Videoconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) -
SC&A: Review of SRS Refined Construction Trade Worker Stratification Comparisons for Plutonium [642 KB (20 pages)]
Presentation at the November 17 and 20, 2020, Videoconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) -
SC&A: Review of NIOSH Response to SC&A Comments on ORAUT-RPRT-0092 re Bioassay Data for Subcontracted Construction Trade Workers at SRS [834 KB (63 pages)]
Presentation at the November 17 and 20, 2020, Videoconference Meeting of the Advisory Board’s Work Group on Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) -
SC&A Draft: Review of NIOSH Response to SC&A on ORAUT-RPRT-0092, Revision 00, on Bioassay Data for Subcontracted Construction Trade Workers at the Savannah River Site [625 KB (47 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SEC006, Revision 0
November 5, 2020 -
SC&A Memo: Review of Multiple Imputation Methods Applied to Censored Bioassay Datasets [135 KB (7 pages)]
June 3, 2020 -
SC&A Memo: Summary Position on Trivalent Bioassay Variability [199 KB (8 pages)]
June 3, 2020 -
SC&A Draft: Review of ORAUT-OTIB-0081, Revision 04, “Internal Coworker Dosimetry Data for the Savannah River Site”, Revision 1 [1.3 MB (79 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SEC004, Revision 1
March 13, 2020 -
SC&A: Review of ORAUT-OTIB-0081, Revision 04, “Internal Coworker Dosimetry Data for the Savannah River Site” [636 KB (31 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Review of ORAUT-RPRT-0092, Evaluation of Bioassay Data for Subcontracted Construction Trade Workers at the Savannah River Site [646 KB (33 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Review of SRS Refined Construction Trade Worker Stratification Comparisons for Plutonium [571 KB (19 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Review of SRS Refined Construction Trade Worker Stratification Comparisons for Plutonium [539 KB (19 pages)]
Presentation at the December 5-6, 2019, Joint Teleconference Meeting of the Advisory Board’s Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) Work Groups -
SC&A: Review of ORAUT-RPRT-0092, Evaluation of Bioassay Data for Subcontracted Construction Trade Workers at the Savannah River Site [663 KB (33 pages)]
Presentation at the December 5-6, 2019, Joint Teleconference Meeting of the Advisory Board’s Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) Work Groups -
SC&A: Review of ORAUT-OTIB-0081, Revision 04, “Internal Coworker Dosimetry Data for the Savannah River Site” [623 KB (31 pages)]
Presentation at the December 5-6, 2019, Joint Teleconference Meeting of the Advisory Board’s Savannah River Site (SRS) and Special Exposure Cohort (SEC) Issues (including the 250 day issue) Work Groups -
SC&A Draft: Review of ORAUT-RPRT-0092, Revision 00, “Evaluation of Bioassay Data for Subcontracted Construction Trade Workers at the Savannah River Site” [2 MB (73 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SEC005, Revision 0
November 12, 2019 -
SC&A Memo: Review of NIOSH’s Refined Construction Trade Worker Stratification Comparisons for Plutonium [293 KB (16 pages)]
November 12, 2019 -
SC&A Draft: SC&A Review of ORAUT-OTIB-0081, Revision 04, “Internal Coworker Dosimetry Data for the Savannah River Site” [2.4 MB (79 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SEC004, Revision 0
September 4, 2019 -
SC&A Memo: SC&A Review of RPRT-0070 Methods for Th-232 Dose Reconstruction [174 KB (9 pages)]
October 11, 2018 -
SC&A Memo: SC&A Review of RPRT-0081 Methods for Thoron Dose Reconstruction [231 KB (9 pages)]
October 11, 2018 -
SC&A Memo: SC&A Comments on NIOSH Draft Permit Sampling Plan [121 KB (6 pages)]
April 26, 2018 -
SC&A Memo: SC&A’s ORAUT-OTIB-0075 Findings of 2010 and 2017 [57 KB (5 pages)]
January 31, 2018 -
SC&A Memo: Missing or Incomplete Radiological Source Terms [2 MB (7 pages)]
January 11, 2018 -
SC&A: Key Issues for Dose Reconstruction of Internal Dose for Subcontractors at Savannah River Site [569 KB (21 pages)]
Presentation at the December 13-14, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Evaluation of ORAUT-RPRT-0083, Revision 00, “Evaluation of Monitoring of Construction Workers Identified in High-Level Cave Job Plans at the Savannah River Site” [470 KB (9 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC012, Revision 0
November 21, 2017 -
SC&A Draft: Evaluation of Savannah River Site Subcontractor Bioassay Data Completeness [296 KB (32 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC009, Revision 0 PC-1
September 22, 2017 -
SC&A Presentation: Evaluation of Savannah River Site Subcontractor Bioassay Data Completeness [118 KB (9 pages)]
Presentation at the August 23-24, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A Draft Review of ORAUT-RPRT-0080 [388 KB (19 pages)]
August 2, 2017 -
SC&A Draft: Evaluation of Savannah River Site Subcontractor Bioassay Data Completeness, Rev. 0 [689 KB (34 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC009, Revision 0
July 13, 2017 -
SC&A Draft: SC&A Review of Dosimetry Coding Methods for Identifying Neptunium Workers at Savannah River Site, Rev. 0 [689 KB (34 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC006, Revision 0
April 10, 2017 -
SC&A Memo: SC&A Review of RPRT-0065 – An Evaluation of Neptunium Operations at Savannah River Site [238 KB (8 pages)]
March 13, 2017 -
SC&A Draft: Focused Review on the Concurrence of ORAUT-OTIB-0081, Revision 03, and the Draft Coworker Implementation Criteria [219 KB (25 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC005, Revision 0
March 13, 2017 -
SC&A Presentation: SC&A Status Summary for SRS [100 KB KB (8 pages)]
Presentation at the March 22-23, 2016, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Dana Heavy Water Plant and Savannah River Site, Rev. 1 [527 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACTED]
April 16, 2015 -
SC&A Draft: Review of ORAUT-RPRT-0055: A Comparison of Exotic Trivalent Radionuclide Coworker Models at the Savannah River Site [1.7 MB (84 pages)]
Contract No. 211-2014-58081
SCA-TR-RPRT2014-0055
November 11, 2014 -
SC&A Memo: SC&A’s Current Evaluation of the SRS SEC Matrix Issue 3 – Recycled Uranium [114 KB (6 pages)]
June 6, 2014 -
SC&A Draft: OCAS-PER-030, Subtask 4 Review of Impacted Cases Reworked for the Evaluation of External Ambient Doses and Internal Intakes from the Savannah River Site, Rev. 0 [341 KB (12 pages)]
Contract No. 211-2014-58081
March 19, 2014 -
SC&A Memo: Discussion Items and Clarifications for February 26th SRS Work Group Meeting [1.3 MB (31 pages)]
February 24, 2014 -
SC&A Working Draft: Issues Matrix for the Savannah River Site SEC Petition and Petition Evaluation Report – February 2014 Update [354 KB (19 pages)]
February 22, 2014 -
SC&A Presentation: OCAS-PER-030, Subtasks 1–3 Evaluation of Savannah River Site (SRS) TBD Revisions (SC&A Report Dated July 1, 2013) [370 KB (14 pages)]
Presentation at the November 7, 2013, Teleconference Meeting of the Advisory Board’s Subcommittee on Procedures Review -
SC&A Draft White Paper: Review of Addendum 3 to the NIOSH Savannah River Site Special Exposure Cohort (SEC-00103) Evaluation Report [794 KB (94 pages)]
Contract Number 200-2009-28555
September 12, 2013 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-030, “SRS TBD Revisions”, Rev. 0 [389 KB (19 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0030, Rev. 0
July 1, 2013 -
SC&A Draft: Master Interview Summary for the Savannah River Site Construction Trades Workers Special Exposure Cohort Review, Rev. 1 [306 KB (66 pages)]
Contract Number 200-2009-28555
April 4, 2012 -
SC&A Draft: Issues Matrix for the Savannah River Site SEC Petition and Petition Evaluation Report [84 KB (16 pages)]
Contract Number 200-2009-28555
December 28, 2011 -
SC&A Draft: Review of Some SRS Claimant Cases to Examine Badge and Area Codes for Adequacy in Thorium [69 KB (11 pages)]
Contract Number 200-2009-28555
November 28, 2011 -
SC&A Draft White Paper: Review of the Worker Comments for the May 22, 2008, Savannah River Site (SRS) Worker Outreach Meeting and Petitioner Supporting Material [176 KB (23 pages)]
Contract No. 200-2009-28555
February 15, 2011 -
SC&A Draft Memo: Matrix Issues 22 and 23 Regarding Petitioner External Dose Issues [57 KB (9 pages)]
January 20, 2011 -
SC&A Draft White Paper: Incident Records at Savannah River Site – Discussion of the Special Exposure Cohort Issue Number 12 Related to Incidents [227 KB (37 pages)]
Contract No. 200-2009-28555
January 14, 2011 -
SC&A Draft White Paper: Review of ORAUT-OTIB-0075 – Use of Claimant Datasets for Coworker Modeling for Construction Workers at Savannah River Site [601 KB (66 pages)]
Contract No. 200-2009-28555
January 13, 2010 -
SC&A Draft: Status Report on the Resolution of the Savannah River Site Issues Resolution Matrix [2.5 MB (147 pages)] Contract No. 200-2004-03805 Task Order No. 1 SCA-TR-TASK1-0003
October 2007 -
SC&A Draft: Review of NIOSH Site Profile for Savannah River Site [2.4 MB (187 pages)]
Contract No. 200-2004-03805
Task Order No. 1 SCA-TR-TASK1-0003
March 21, 2005
-
-
Seymour Specialty Wire
-
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-072, “Seymour Specialty Wiring Company” [291 KB (28 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-072, “Seymour Specialty Wiring Company” [441 KB (28 pages)]
Presentation at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-072, “Seymour Specialty Wiring Company” [405 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER072, Revision 0
January 30, 2024
-
-
Simonds Saw and Steel Co.
-
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (95 pages)]
Presentation at the April 19-20, 2023, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Memo: Position on Findings 6 and 7 of the Simonds Saw and Steel TBD Review [935 KB (13 pages)]
(June 3, 2014) -
SC&A Draft: Supplementary Comments on Revision 01 of Battelle-TBD-6000, Rev. 0 [428 KB (34 pages)]
Contract No. 200-2009-28555
May 13, 2013 -
SC&A: Simonds Saw and Steel Site Profile Review Issues Matrix [55 KB (10 pages)]
February 13, 2013 -
SC&A Draft: Review of the Site Profile for the Simonds Saw and Steel Plant [688 KB (61 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2012-0013
June 13, 2012
-
-
Skin Dose (general, not site-specific)
-
SC&A: Issues Resolution Matrix for NIOSH-OVER-0009, “Skin Exposure” [255 KB (3 pages)]
March 23, 2018 -
SC&A: Issues Resolution Matrix for NIOSH-OVER-0009, “Skin Exposure” [59 KB (3 pages)]
November 29, 2017 -
Draft: Discussion Points Regarding Reconstructing Localized Skin Dose Associated with Direct Deposition of Uranium Oxide Dust and Flakes on Exposed Skin [364 KB (15 pages)]
Contract No. 200-2009-28555
June 12, 2013
-
-
Special Exposure Cohort (SEC)
-
Draft: Review of ORAUT-PROC-0044: Special Exposure Cohort (SEC), Revision 00, October 7, 2005 [1 MB (49 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2012-0011, Rev. 0
October 15, 2013 -
Draft: Board Procedures for Review of Special Exposure Cohort Petitions and Petition Evaluation Reports [209 KB (33 pages)]
Contract No. 200-2004-03805
Task Order No. 5
SCA-TR-TASK5-0002
November 30, 2005 -
Draft: Review of NIOSH/ORAU Special Exposure Cohort Evaluation Procedures [272 KB (36 pages)]
Contract No. 200-2004-03805
Task Order No. 5
SCA-TR-TASK5-0001
November 23, 2005
-
-
Stanford Linear Accelerator Center
-
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Draft: Review of the Site Profile for the Stanford Linear Accelerator Center [648 KB (86 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0011, Rev. 0
December 20, 2011
-
-
Superior Steel Co.
-
SC&A: Superior Steel Co. Special Exposure Cohort (SEC-00247) Issues Matrix revision 02 [150 KB (18 pages)]
March 15, 2021 -
SC&A Draft: Superior Steel Co. Special Exposure Cohort (SEC-00247) Issues Matrix [232 KB (15 pages)]
January 14, 2020 -
SC&A Draft: SC&A Review of the SEC Petition Evaluation Report for Petition SEC-00247: Superior Steel Co. [264 KB (24 pages)]
June 10, 2019 -
SC&A: Superior Steel Co. SEC Petition SEC-00247 Preliminary Review [327 KB (16 pages)]
Presentation at the April 17, 2019, Meeting of the Advisory Board on Radiation and Worker Health
-
T
-
Technical Basis for Sampling Plan:
-
SC&A Presentation: Summary of Four Document Reviews Approved by the Subcommittee for Procedure Reviews [860 KB (71 pages)]
Presentation at the April 17, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Evaluation of ORAUT-RPRT-0078, Revision 00, “Technical Basis for Sampling Plan” [145 KB (11 pages)]
Contract No. 211-2014-58081
October 3, 2017
-
-
Technical Documents (Site Profiles/Technical Basis Documents):
-
SC&A Presentation: SC&A’s Review of Rocky Flats Plant Technical Basis Document Revisions and Issues [391 KB (21 pages)]
Presentation at the October 4, 2022, Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats Plant -
SC&A Memo: SC&A Comments on NIOSH’s Responses to SCA-TR-2019-PR004, “Peek Street Facility” [547 KB (7 pages)]
September 8, 2022 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-093, “Texas City Chemicals, TBD Rev. 01” [586 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PER093, Revision 0
May 5, 2022 -
SC&A Draft: Review of 2019–2020 Revisions to Rocky Flats Plant Technical Basis Documents [689 KB (60 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-SP001, Revision 0
December 3, 2021 -
SC&A Draft: DCAS-PER-080, Subtask 4: Review of Five Cases Reevaluated by NIOSH Using TBD-6000, Appendix BB, Revisions 2 and 3 [245 KB (24 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PER080-ST4, Revision 0
July 19, 2018 -
SC&A: Weldon Spring Plant Site Profile Findings Matrix [442 KB (14 pages)]
February 1, 2018 -
SC&A: Weldon Spring Plant Site Profile Observations Matrix [360 KB (4 pages)]
February 1, 2018 -
SC&A Draft: Issues Resolution Matrix for Pacific Proving Grounds Site Profile [87 KB (10 pages)]
Contract No. 211-2014-58081
September 6, 2017 -
SC&A: Issues Resolution Matrix for Fernald Site Profile and SEC Petition [381 KB (8 pages)]
August 9, 2017 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 5 [483 KB (71 pages)]
Contract No. 211-2014-58081
SCA-SP-IM2013-0045, Revision 5
August 9, 2017 -
SC&A Memo: Current Status of ANL-E Site Profile Findings and Observations [59 KB (7 pages)]
July 17, 2017 -
SC&A Draft: A Draft Review of ORAUT-TKBS-0017-5, Revision 03, Feed Materials Production Center – Occupational Internal Dose [241 KB (29 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP004, Revision 0
July 6, 2017 -
SC&A Memo: Remaining Site Profile (TBD) Issues [63 KB (5 pages)]
March 10, 2017 -
SC&A Memo: Updated Status Report on SC&A Review of NIOSH Response Paper [163 KB (5 pages)]
March 12, 2017 -
SC&A Draft: SC&A’s Focused Evaluation of LLNL ORAUT-TKBS-0035-5, Revision 03, for TBD-5 Issue Resolution [112 KB (15 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC004, Revision 0
February 7, 2017 -
SC&A Draft: Review of Revision 03 to the Site Profile for Nuclear Materials and Equipment Corporation, Apollo and Parks Township, Pennsylvania [272 KB (35 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP001, Revision 0
February 6, 2017 -
SC&A Draft: SC&A’s Evaluation of Resolution of Pantex Site Profile Issues in Revision 03 to Pantex External Dose Technical Base Document [97 KB (10 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SP002, Revision 0
January 30, 2017 -
SC&A Memo: SC&A Review of Site Profile for the Kansas City Plant, ORAUT-TKBS-0031, Revision 01 [76 KB (6 pages)]
January 30, 2017 -
SC&A Memo: Reply to NIOSH Response Paper Regarding Appendix BB, Revision 2 [116 KB (3 pages)]
December 9, 2016 -
SC&A Memo: Y-12 ORAUT-OTIB-0013 and ORAUT-PROC-0042 Findings and Resolutions [71 KB (7 pages)]
October 20, 2016 -
SC&A: Pantex TBD and OTIB-0086 Neutron NTA Film Correction Factor Issues [62 KB (4 pages)]
October 19, 2016 -
SC&A Draft: Review of the NIOSH Site Profile for the Argonne National Laboratory-East [142 KB (18 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SP005, Revision 1
June 5, 2016 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 4 [637 KB (51 pages)]
Contract No. 211-2014-58081
SCA-SP-IM2013-0045, Revision 4
May 18, 2016 -
SC&A Memo: Review of ORAUT-TKBS-0017-4, Rev. 3 [198 KB (7 pages)]
May 18, 2016 -
SC&A Memo: Program Evaluation Reports and Technical Guidance Documents Not Tasked for SC&A’s Review [267 KB (8 pages)]
February 23, 2016 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB, Rev. 1, to TBD-6000 [314 KB (13 pages)]
November 13, 2015 -
SC&A: Review of NIOSH Response Paper: July 10, 2015 [256 KB (9 pages)]
Presentation from the November 3, 2015, Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB, Rev. 1, to TBD-6000 [248 KB (14 pages)]
September 25, 2015 -
SC&A Draft: SC&A’s Evaluation of the Pantex External Coworker Model, Rev. 0 [311 KB (17 pages)]
Contract No. 211-2014-58081
September 23, 2015 -
SC&A Draft: SC&A’s Review of the NIOSH Document Issued July 29, 2015, Titled, “NIOSH Response to SC&A Review of the Ames Site Profile Document Regarding Uranium Internal Exposure” [107 KB (14 pages)]
Contract No. 211-2014-58081, Revision 0
September 8, 2015 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-055, “TBD-6000 Revision, 9/12/2014,” Rev. 0 [577 KB (23 pages)]
Contract No. 211-2014-58081
SCA-TR-PER2015-0097
July 24, 2015 -
SC&A Draft: Review of “Site Profiles for Atomic Weapons Employers that Worked Uranium Metals: Appendix J-Joslyn,” Rev. 0 [616 KB (33 pages)]
Contract Number 211-2014-58081
SCA-TR-SP2015-0050
May 12, 2015 -
SC&A Draft: Focused Review of Appendix C, Revision 1 to TBD-6000, Dow Chemical Company (Madison Site) [463 KB (22 pages)]
Contract No. 211-2014-58081
SCA-TR-SP2015-0051, Revision 0
April 9, 2015 -
SC&A Presentation: Review of Appendix BB, Rev. 1 – General Steel Industries [297 KB (8 pages)]
February 5, 2015, Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000 -
SC&A Presentation: Review of Two NIOSH Response Papers [261 KB (3 pages)]
February 5, 2015, Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000 -
SC&A Memo: Review of NIOSH’s Response Paper No. 2: “General Steel Industries Layout man Beta Skin Dose” [361 KB (22 pages)]
January 30, 2015 -
SC&A Draft White Paper: SC&’s Evaluation of the Weldon Spring Site Profile Changes Compared to the Original Findings [506 KB (16 pages)]
Contract Number 211-2014-58081
January 9, 2015 -
SC&A Memo: Review of “Site Profiles for Atomic Weapons Employers that Worked Uranium Metals Appendix BB – General Steel Industries,” Revision 1 [547 KB (16 pages)]
December 10, 2014 (replaces previous version dated October 29, 2014) -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment [884 KB (41 pages)]
Contract 211-2014-58081
SCA-SP-IM2013-0045, Revision 3
November 26, 2014 -
SC&A Draft: Resolution of SC&A Findings Developed during Review of “DCAS-TKBS-0006, Revision 00,” Rev. 0 [260 KB (10 pages)]
Contract No. 211-2014-58081
November 21, 2014 -
SC&A Working Draft: Pantex Plant Site Profile Issues Matrix Draft Preliminary SC&A Assessment, Rev. 4 [522 KB (38 pages)]
Contract No. 211-2014-58081
September 29, 2014 -
SC&A Working Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 2 [486 KB (40 pages)]
September 1, 2014 -
SC&A Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment, Rev. 1 [485 KB (31 pages)]
Contract 200-2009-28555
SCA-SP-IM2013-0045, Rev. 1
April 13, 2014 -
SC&A Draft: Idaho National Laboratory (INL) Site Profile Review Status Update, Revision 1 [550 KB (75 pages)]
February 24, 2014 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [371 KB (29 pages)]
January 15, 2014 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [370 KB (29 pages)]
December 18, 2013 -
SC&A Draft: Review of the NIOSH Site Profile for the West Valley Demonstration Project in West Valley, New York [638 KB (57 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0008, Rev. 1
December 5, 2013 -
SC&A: Huntington Pilot Plant Site Profile Review – Findings Matrix [102 KB (4 pages)]
November 18, 2013 -
SC&A Draft: Review of the Summary Site Profile for the Pacific Proving Grounds, Rev. 1 [2 MB (65 pages)]
Contract No. 200-2009-28555
November 5, 2013 -
SC&A Working Draft: Fernald Plant Site Profile Issues Matrix – Draft Preliminary SC&A Assessment [411 KB (26 pages)]
Contract Number 200-2009-28555
SCA-SP-IM2013-0045, Revision 0
October 16, 2013 -
SC&A Memo: Response to Comments Regarding Time to Reach Equilibrium for the Buildup of Uranium on Surfaces [202 KB (2 pages)]
October 14, 2013 -
SC&A Working Draft: Pantex Plant Site Profile Issues Matrix Draft Preliminary SC&A Assessment, Rev. 3 [507 KB (38 pages)]
Contract No. 200-2009-28555
October 8, 2013 -
SC&A Draft White Paper: Comments on the NIOSH White Paper, “TBD 6000 Review by SC&A, Determination of Settling Time,” Rev. 0 [301 KB (8 pages)]
Contract Number 200-2009-28555
October 7, 2013 -
SC&A Draft: Response to NIOSH’s Commentary on Findings Regarding the Site Profile for Du Pont Deepwater Works, Rev. 0 [119 KB (16 pages)]
Contract No. 200-2009-28555
June 6, 2013 -
SC&A Draft: Review of the Revised Huntington Pilot Plant Site Profile [537 KB (25 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2013-0043
June 4, 2013 -
SC&A Draft: Supplementary Comments on Revision 01 of Battelle-TBD-6000, Rev. 0 [427 KB (34 pages)]
Contract No. 200-2009-28555
May 13, 2013 -
SC&A Draft: Review of the NIOSH Site Profile for Nuclear Materials and Equipment Parks Township and Apollo Sites [834 KB (74 pages)]
April 19, 2013 -
SC&A Draft: Preliminary Review of the Revised Site Profile for the Huntington Pilot Plant [65 KB (12 pages)]
Contract No. 200-2009-28555
March 21, 2013 -
SC&A: Simonds Saw and Steel Site Profile Review Issues Matrix [55 KB (10 pages)]
February 13, 2013 -
SC&A Draft: Review of the NIOSH Site Profile for the W.R. Grace and Company in Erwin, Tennessee [275 KB (39 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2013-0041
January 16, 2013 -
SC&A Draft: Update of the Nevada Test Site (NTS) Issue Resolution Matrix Based on the SC&A Review of the NIOSH Site Profile for the Nevada Test Site [272 KB (48 pages)]
Contract No. 200-2009-28555
December 14, 2012 -
SC&A Draft: Site Profile Issues Matrix for Portsmouth [290 KB (9 pages)]
October 8, 2012 -
SC&A Draft: Review of the NIOSH Site Profile for the Kansas City Plant [331 KB (29 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2012-0006
September 6, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #3, Rev. 0 [123 KB (5 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #2, Rev. 0 [93 KB (14 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #3, Rev. 0 [123 KB (5 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issues #6, #7, and #8, Rev. 0 [160 KB (17 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft White Paper: SC&A Review of Lawrence Berkeley National Laboratory Site Profile Matrix Issue #9, Rev. 0 [32 KB (5 pages)]
Contract No. 200-2009-28555
September 5, 2012 -
SC&A Draft: Review of the Site Profile for the Simonds Saw and Steel Plant [688 KB (61 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2012-0013
June 13, 2012 -
SC&A Draft: Review of the Site Profile for the Clarksville and Medina Plants [164 KB (32 pages)]
Contract No. 200-Clarksville Facility
SCA-TR-SP2012-0007, Rev. 0
February 22, 2012 -
SC&A Draft: SC&A’S Issues Matrix for the Brookhaven National Laboratory Site Profile Technical Basis Document [67 KB (16 pages)]
February 13, 2012 -
SC&A’s Issues Matrix for the Lawrence Berkeley National Laboratory Site Profile Technical Basis Document [149 KB (17 pages)]
January 26, 2012 -
SC&A Draft White Paper: SC&A Response to NIOSH White Paper, “Baker-Perkins TBD Review,” Dated December 12, 2011 [211 KB (18 pages)]
Contract No. 200-2009-28555
January 17, 2012 -
SC&A Draft: Review of the Site Profile for the Stanford Linear Accelerator Center [691 KB (86 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0011, Rev. 0
December 20, 2011 -
SC&A Draft: Review of the NIOSH Site Profile for Baker-Perkins, Saginaw, Michigan (DCAS-TKBS-0005) [255 KB (15 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0036, Revision 1
November 2, 2011 -
SC&A Draft: Review of the NIOSH Site Profile for Du Pont Chambers Works, Deepwater NJ [232 KB (23 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2011-0035
August 12, 2011 -
Draft: A Focused Review of the Norton Company SEC Petition Evaluation Report SEC-00173 Concerning the Use of ORAUT-OTIB-0070 for the Reconstruction of Doses from Residual/Post-Operational Contamination [739 KB (14 pages)]
Contract No. 200-2009-28555
July 7, 2011 -
SC&A Draft: Review of the NIOSH Site Profile for the Hooker Electrochemical Company (Battelle-TBD-6001, Appendix AA) [186 KB (28 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2010-0034
September 9, 2010 -
SC&A Draft: Review of the NIOSH Site Profile for Lawrence Berkeley National Laboratory [1.5 MB (83 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2010-0002
January 22, 2010 -
SC&A Draft White Paper: Review of ORAUT-OTIB-0075 – Use of Claimant Datasets for Coworker Modeling for Construction Workers at Savannah River Site [601 KB (66 pages)]
Contract No. 200-2009-28555
January 13, 2010 -
SC&A Draft: Assessment of the Disposition of SC&A’s Linde Site Profile Review Issues in Response to SEC Petitioner Concerns [499 KB (74 pages)]
Contract No. 200-2009-28555
August 20, 2009 -
SC&A Draft: Review of the NIOSH Site Profile for the Santa Susana Field Laboratory, with Attachment 1: Summary of Site Expert Interviews [1 MB (77 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0027
September 17, 2009 -
SC&A Draft: Review of the NIOSH Site Profile for Brookhaven National Laboratory [462 KB (59 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-SP2009-0001
September 9, 2009 -
SC&A Draft: Review of the NIOSH Site Profile for the Argonne National Laboratory-East [912 KB (103 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0023
March 11, 2009 -
SC&A Draft: Review of Site Profile for Sandia National Laboratories in Albuquerque, New Mexico, and the Tonopah Test Range in Nevada [606 KB (82 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0022
February 12, 2009 -
SC&A Draft: Review of the NIOSH Site Profile for the Weldon Spring Site in Weldon Spring, Missouri [582 KB (91 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0028
February 10, 2009 -
SC&A Draft: Idaho National Laboratory Site Profile Review Update–Supplement 1 [1.0 MB (57 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0005
December 30, 2008 -
SC&A Draft: Review of the NIOSH Site Profile for the Santa Susana Field Laboratory, with Attachment 1: Summary of Site Expert Interviews [547 KB (77 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0027
August 16, 2008 (updated) -
SC&A Draft: Review of the NIOSH Site Profile for the Santa Susana Field Laboratory [1.0 MB (57 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0027
August 16, 2008 -
SC&A Draft: Pantex Plant Site Profile Review [1.1 MB (136 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0019
July 17, 2008 -
SC&A Draft: A Draft Report for Consideration by the Advisory Board Regarding the Closeout of Findings from Selected Site Profile Reviews [409 KB (49 pages)]
Contract No. 200-2004-03805
Task Order No. 1
May 5, 2008 -
SC&A Memo and Draft Report: Site Profiles for Atomic Weapons Employers That Worked Uranium and Thorium Metals – Appendix BB: General Steel Industries, Battelle-TBD- 6000, Appendix BB, Rev. 0 [1.7 MB (92 pages)]
Contract No. 200-2004-03805
Task Order No. 1
April 21, 2008 -
SC&A Draft Review of Battelle-TBD-6001, Site Profiles for Atomic Weapons Employers That Worked Uranium And Thorium Metals, Revision FO Dated December 13, 2006 [378 KB (53 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0026
February 26, 2008 -
SC&A Memo and Draft Report: Review of the NIOSH Site Profile for the Portsmouth Gaseous Diffusion Plant [4 MB (90 pages)]
Contract No. 200-2004-03805
Task Order No. 1
February 6, 2008-
Attachment 1: Summary of Site Expert Interviews [245 KB (32 pages)]
Task Order No. 1-0020
April 18, 2008
-
-
SC&A Draft: SC&A Review of the Lawrence Livermore National Laboratory Site Profile [1 MB (169 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0018, Revision 1
August 27, 2007 -
SC&A Draft: SC&A Review of the K-25 Gaseous Diffusion Plant Site Profile [3 MB (192 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0017
May 31, 2007 -
SC&A Draft: Review of the NIOSH Site Profile for the Fernald Environmental Management Project (Feed Materials Production Center) [766 KB (170 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0010
November 10, 2006 -
SC&A Draft: Paducah Gaseous Diffusion Plant Site Profile Review [2.42 MB (154 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0016
October 20, 2006 -
SC&A Draft: Oak Ridge National Laboratory Site Profile Review [1.36 MB (116 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0013
September 29, 2006 -
SC&A Draft: Review of the NIOSH Site Profile for the Pinellas Plant Site [485 KB (71 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0015
September 15, 2006 -
SC&A Draft: Los Alamos National Laboratory Site Profile Review [2.1 MB (214 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0011
August 28, 2006 -
SC&A Draft: Review of NIOSH Site Profile for the Mound Laboratory Site [2 MB (192 pages)]
July 16, 2006 -
SC&A Draft: Review of the NIOSH Site Profile for the Idaho National Laboratory, Idaho–Revision 1 [2 MB (250 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0005
January 25, 2006 -
SC&A Draft: Y-12 National Security Complex Site Profile Review [2 MB (204 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0007
September 19, 2005 -
SC&A Draft: Review of the NIOSH Site Profile for the Nevada Test Site [2 MB (159 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0006
December 13, 2005 -
SC&A Draft: Rocky Flats Plant Site Profile Review [3 MB (263 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0008
December 8, 2005 -
SC&A Draft: Review of the NIOSH Site Profile for the Idaho National Laboratory, Idaho [2 MB (187 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0005
September 23, 2005 -
SC&A Draft: Los Alamos National Laboratory Site Profile Review [2.1 MB (214 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0011
August 28, 2006 -
SC&A Draft: Review of the NIOSH Site Profile for the Linde Ceramics Plant and Tonawanda Laboratory, Tonawanda, New York [1.43 MB (126 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0014
July 14, 2006 -
SC&A Final Draft: Review of NIOSH Site Profile for the Atomic Energy Operations at the Iowa Army Ammunition Plant (IAAP) [972 KB (93 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0009
June 29, 2005 -
SC&A Draft: Review of NIOSH Site Profile for the Hanford Site, Richland, Washington [4 MB (222 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0004
June 29, 2005 -
SC&A Draft: Review of NIOSH Site Profile for Savannah River Site [787 KB (187 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0003
March 21, 2005 -
SC&A Draft: Review of NIOSH Site Profile for Mallinckrodt Chemical Company, St. Louis Downtown Site, St. Louis, MO. [420 KB (102 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0002
January 31, 2005 -
SC&A Draft: Review of NIOSH Site Profile for Bethlehem Steel Plant, Lackawanna, NY [512 KB (87 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0001
October 14, 2004
-
-
Technical Documents (Technical Information Bulletins):
-
SC&A Presentation: Summary of Six Document Reviews Approved by the Subcommittee for Procedure Reviews [691 KB (73 pages)]
Presentation at the December 5, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: Review of ORAUT-OTIB-0093, Revision 00 [213 KB (8 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of ORAUT-OTIB-0040, Revision 00 PC-1, “External Coworker Dosimetry Data for the Portsmouth Gaseous Diffusion Plant” [333 KB (30 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of ORAUT-OTIB-0036, Revision 00, “Internal Coworker Bioassay Data for Portsmouth Gaseous Diffusion Plant” [271 KB (27 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Summary of Eight Document Reviews Approved by the Subcommittee for Procedure Reviews [317 KB (42 pages)]
Presentation at the August 7-8, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: A Review of ORAUT-OTIB-0040 for External Coworker Dosimetry Data for the Portsmouth Gaseous Diffusion Plant [356 KB (13 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR040, Revision 0
May 29, 2024 -
SC&A Draft: A Review of ORAUT-OTIB-0036 for Internal Coworker Bioassay Data for the Portsmouth Gaseous Diffusion Plant [392 KB (13 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR036, Revision 0
May 29, 2024 -
SC&A Draft: Review of ORAUT-OTIB-0093, Revision 00 [258 KB (7 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2024-PR093, Revision 0
May 23, 2024 -
SC&A Presentation: Summary of Four Document Reviews Approved by the Subcommittee for Procedure Reviews [860 KB (71 pages)]
Presentation at the April 17, 2024, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation Handout: Sites with Unreviewed DR Methodology Templates and Reports [463 KB (5 pages)]
Presentation Handout at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation Handout: SPR-Approved Document Reviews [479 KB (7 pages)]
Presentation Handout at the March 14, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Summary of Five Document Reviews Approved by the Subcommittee for Procedure Reviews [422 KB (71 pages)]
Presentation at the August 16, 2023, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: A Review of ORAUT-OTIB-0087 for Extremity Doses for Mound Exposures to Plutonium-238 [246 KB (20 pages)]
Presentation at the June 21, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Example of “Not Suitable for Matrix” Presentation [260 KB (17 pages)]
Presentation at the June 21, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of ORAUT-OTIB-0087 for Extremity Doses for Mound Exposures to Plutonium-238 [867 KB (21 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PR087, Revision 0
April 21, 2023 -
SC&A Presentation: Summary of Seven Document Reviews Approved by the Subcommittee for Procedure Reviews [446 KB (90 pages)]
Presentation at the December 8, 2022, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Handout: SCPR-Approved Document Reviews [193 KB (5 pages)]
Handout at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: History of Advisory Board Review of ORAUT-OTIB-0052 [225 KB (10 pages)]
Presentation at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Handout: Carryover Items from February 2019 and 2021 SCPR Meetings [661 KB (8 pages)]
Discussion/Background Paper at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of One Advisory Board-Selected Case Reworked for the Evaluation of ORAUT-OTIB-0052 Revisions (DCAS-PER-062, Subtask 4) [571 KB (24 pages)]
Presentation at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Summary of Seven Document Reviews Approved by the Subcommittee for Procedure Reviews [1 MB (89 pages)]
Presentation at the April 27-28, 2022, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Presentation: SC&A’s Focused Evaluation of ORAUT-OTIB-0088, Revision 02, “External Dose Reconstruction” [362 KB (14 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of Battelle-TIB-5000 Default Assumptions and Methods for AWE Sites [889 KB (28 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: Review of Battelle-TIB-5000, “Default Assumptions and Methods for Atomic Weapons Employer Dose Reconstructions” [2.3 MB (30 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PR001, Revision 0
January 10, 2022 -
SC&A Draft: SC&A’s Focused Review of ORAUT-OTIB-0088, Revision 02, “External Dose Reconstruction” [804 KB (10 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PR088, Revision 0
January 7, 2022 -
SC&A Presentation: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [497 KB (27 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Presentation: SC&A’s Evaluation of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [322 KB (16 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Focused Review of ORAUT-OTIB-0066, Revision 01, for Resolution of Issues [259 KB (13 pages)]
Presentation at the November 3, 2021, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: Focused Review of ORAUT-OTIB-0066, Revision 01, for Resolution of Issues [166 KB (4 pages)]
April 28, 2021 -
SC&A: Focused Review of ORAUT-OTIB-0006, revision 06, for Resolution of Issues [236 KB (10 pages)]
February 3, 2021 -
SC&A: Review of ORAUT-OTIB-0081, Revision 04, “Internal Coworker Dosimetry Data for the Savannah River Site” [636 KB (31 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: ORAUT-OTIB-0082 Dose Reconstruction Method for Chronic Lymphocytic Leukemia [183 KB (15 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: ORAUT-OTIB-0088 External Dose Reconstruction [171 KB (5 pages)]
Presentation at the December 11, 2019, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0045, Revision 01, “Historical Evaluation of the Film Badge Dosimetry Program at the Y-12 Plant in Oak Ridge, Tennessee: Part 2 – Neutron Radiation” [147 KB (14 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-PR003, Revision 0
January 14, 2019 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0006, Revision 05, “Dose Reconstruction from Occupational Medical X-Ray Procedures” [200 KB (14 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-PR002, Revision 0
January 14, 2019 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0088, Revision 00, “External Dose Reconstruction” [169 KB (8 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-PR001, Revision 0
January 8, 2019 -
SC&A Draft: Review of NIOSH’s Program Evaluation Report DCAS-PER-062, “ORAUT-OTIB-0052” [120 KB (15 pages)]
Contract No. 211-2014-58081
SCA-TR-2018-PR002, Revision 0
May 31, 2018 -
SC&A: Issues Resolution Matrix for ORAUT-OTIB-0034, Revision 01, “Internal Dosimetry Coworker Data for X-10” [355 KB (5 pages)]
March 26, 2018 -
SC&A: Issues Resolution Matrix for ORAUT-OTIB-0017, Revision 01, “Interpretation of Dosimetry Data for Assignment of Shallow Dose” [82 KB (6 pages)]
November 29, 2017 -
Advisory Board Presentation: ORAUT-OTIB-0020 Use of Coworker Dosimetry Data for External Dose Assignment [150 KB (10 pages)]
Presentation at the December 13-14, 2017, Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: Issues Resolution Matrix for ORAUT-OTIB-0020, “Use of Coworker Dosimetry Data for External Dose Assignment” [58 KB (4 pages)]
November 30, 2017 -
SC&A: Issues Resolution Matrix for ORAUT-OTIB-0052, “Parameters to Consider When Processing Claims for Construction Trade Workers” [98 KB (10 pages)]
November 30, 2017 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0075, Revision 01, “Use of Claimant Datasets for Coworker Modeling” [131 KB (18 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR011, Revision 0
October 9, 2017 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0044, Revision 01, “Historical Evaluation of the Film Badge Dosimetry Program at the Y-12 Facility in Oak Ridge, Tennessee: Part 1 – Gamma Radiation” [1 MB (32 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR006, Revision 0
July 17, 2017 -
SC&A Draft: Evaluation of ORAUT-OTIB-0064, Revision 02, Coworker External Dosimetry Data for the Y-12 National Security Complex [356 KB (17 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR003, Revision 0
May 22, 2017 -
SC&A Draft: Focused Review on the Concurrence of ORAUT-OTIB-0081, Revision 03, and the Draft Coworker Implementation Criteria [219 KB (25 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-SEC005, Revision 0
March 13, 2017 -
SC&A Memo: OCAS-TIB-0014 Finding from Subcommittee for Procedure Reviews [41 KB (1 page)]
March 2, 2017 -
SC&A: Pantex TBD and OTIB-0086 Neutron NTA Film Correction Factor Issues [62 KB (4 pages)]
October 19, 2016 -
SC&A’s Evaluation of OTIB-0054 Workbook 1.5.11 with Air Concentration Data [315 KB (7 pages)]
April 2, 2015 -
SC&A Draft: A Review of “ORAUT-OTIB-0080, Rev. 00: Internal Coworker Dosimetry Data for Area IV of the Santa Susana Field Laboratory and the DeSoto Avenue Facility,” Rev. 0 [1.3 MB (69 pages)]
Contract No. 211-2014-58081
SCA-TR-OTIB2014-0080, Rev. 0
November 24, 2014 -
SC&A Draft White Paper: Review of Database Used to Develop ORAUT-OTIB-0077: External Coworker Dosimetry Data for Area IV of the Santa Susana Field Laboratory, Rev. 1 [161 KB 919 pages)]
Contract No. 200-2009-28555
Revised March 15, 2010 -
SC&A Draft: SC&A Review of NIOSH Responses to SC&A Comments on ORAUT-OTIB-0054, Rev. 1: Fission and Activation Product Assignment for Internal Dose-Related Gross Beta and Gross Gamma Analyses [757 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0084, Rev. 0
April 10, 2014 -
SC&A Draft: Review of ORAUT-OTIB-0083, Rev. 0 Dissolution Models for Insoluble Plutonium-238 [646 KB (27 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0084, Rev. 0
December 24, 2013 -
SC&A Draft: A Focused Review of ORAUT-OTIB-0034, Rev. 01 Internal Dosimetry Coworker Data for X-10 [370 KB (19 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0084, Rev. 0
November 20, 2013 -
SC&A Draft: Review of “ORAUT-OTIB-0054, Fission and Activation Product Assignment for Internal Dose-Related Gross Beta and Gross Gamma Analyses, Rev. 1” [525 KB (29 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0084, Rev. 0
November 5, 2013 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-011: K-25 TBD and TIB Revisions [441 KB (34 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0080, Rev. 0
April 24, 2013 -
SC&A Draft: Review of ORAUT-OTIB-0079: Guidance on Assigning Occupational X-ray Dose under EEOICPA for X-rays Administered Off Site [307 KB (11 pages)]
Contract No. 200-2009-28555
January 25, 2013 -
SC&A Draft: Pre-Reviews of Revised Documents ORAUT-OTIB-0005, ORAUT-PROC-0031, ORAUT-PROC-0061, and ORAUT-OTIB-0020 [245 KB (10 pages)]
Contract No. 200-2009-28555
January 25, 2013 -
SC&A Draft: Review of ORAU-OTIB-0055 – Technical Basis for Conversion from NCRP Report 38 Neutron Quality Factors to ICRP Publication 60 Radiation Weighting Factors for Respective IREP Input Neutron Energy Ranges [604 KB (19 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0055, Revision 0
January 25, 2013 -
Draft: Review of ORAUT-OTIB-0052, Parameters to Consider When Processing Claims for Construction Trade Workers [127 KB (26 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2011-0004, Rev. 0
Document No. SCA-TR-PR2011-0004
July 11, 2011 -
SC&A Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction (contains review of OCAS-TIB-0002, Rev. 0) [2 MB (260 pages)]
January 17, 2005 -
SC&A Technical Review Summary: Overview of OCAS-TIB-0002, Rev. 0: Tritium Calculations with IMBA [148 KB (2 pages)]
January 20, 2011 -
NIOSH/ORAU Report: OCAS-TIB-0002, Rev. 0 – Tritium Calculations with IMBA [670 KB (4 pages)]
April 22, 2003 -
SC&A Technical Review Summary: Overview of ORAU-TIB-0003, Rev. 0: Savannah River Site Tritium Dose Assignment [138 KB (2 pages)]
January 20, 2011 -
NIOSH/ORAU Report: ORAU-TIB-0003, Rev. 0: Savannah River Site Tritium Dose Assignment [79 KB (6 pages)]
October 3, 2003 Note: This document was canceled. The information contained in this document can now be found in ORAUT-OTIB-0011 Rev-00: Tritium Calculated and Missed Dose Estimates -
SC&A Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction (contains review of ORAU-OTIB-0004, Rev. 2) [2 MB (260 pages)]
January 17, 2005 -
NIOSH/ORAU Report: ORAU-OTIB-0004, Rev. 2: Estimating the Maximum Plausible Dose to Workers at Atomic Weapons Employer Facilities [166 KB (13 pages)]
December 5, 2003
Note: This document is no longer needed for dose reconstructions. Information in this document has been superseded by other approved methodologies. -
SC&A Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction (contains review of OCAS-TIB-0006, Rev. 1) [2 MB (260 pages)]
January 17, 2005 -
NIOSH Report: OCAS-TIB-0006, Rev. 1: Interpretation of External Dosimetry Records at the Savannah River Site (SRS) [16 KB (3 pages)]
February 20, 2004
Note: This document is no longer needed for dose reconstructions. Information in this document has been superseded by other approved methodologies. -
SC&A Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction (contains review of OCAS-TIB-0007, Rev. 0) [2 MB (260 pages)]
January 17, 2005 -
SC&A Technical Review Summary: Overview of OCAS-TIB-0007, Rev. 0: Neutron Exposures at the Savannah River Site [130 KB (1 page)]
January 20, 2011 -
NIOSH Report: OCAS-TIB-0007, Rev. 0: Neutron Exposures at the Savannah River Site [536 KB (6 pages)]
September 17, 2003 -
SC&A Report: Review of NIOSH/ORAU Procedures and Methods Used for Dose Reconstruction (contains review of ORAU-TIB-0008, Rev. 0) [2 MB (260 pages)]
January 17, 2005 -
NIOSH/ORAU Report: ORAUT-OTIB-0015, Rev. 0 – Bayesian Methods for Estimation of Unmonitored Y-12 External Penetrating Doses with a Time-Dependent Lognormal Model [206 KB (11 pages)]
November 7, 2003
Note: ORAUT-OTIB-0015 was canceled because Bayesian methods are no longer used for dose reconstructions. -
SC&A Technical Review Summary: Overview of ORAUT-OTIB-0022, Rev. 0: Guidance on Wound Modeling for Internal Dose Reconstruction [125 KB (1 page)]
January 20, 2011 -
NIOSH/ORAU Report: ORAUT-OTIB-0022 Rev 0 – Guidance on Wound Modeling for Internal Dose Reconstruction [110 KB (9 pages)]
November 18, 2005 -
SC&A Technical Review Summary: Overview of ORAUT-OTIB-0028, Rev. 1: Validation of Thorium Annual Dose Conversion Factors [165 KB (2 pages)]
January 20, 2011 -
NIOSH/ORAU Report: ORAUT-OTIB-0028, Rev. 1 – Validation of Thorium Annual Dose Conversion Factors [487 KB (22 pages)]
July 28, 2008 -
SC&A Technical Review Summary: Overview of ORAUT-OTIB-0030, Rev. 0: External Coworker Dosimetry Data for the Hanford Site [156 KB (1 page)]
January 20, 2011 -
NIOSH/ORAU Report: ORAUT-OTIB-0030, Rev. 0 – External Coworker Dosimetry Data for the Hanford Site [39 KB (8 pages)]
March 23, 2005 -
SC&A Report: Review of ORAUT-OTIB-0066, Rev. 0 – Calculation of Dose from Intakes of Special Tritium Compounds [448 KB (26 pages)]
November 25, 2008 -
SC&A Technical Review Summary: Overview of ORAUT-OTIB-0066, Rev. 0 – Calculation of Dose from Intakes of Special Tritium Compounds [155 KB (2 pages)]
September 13, 2010 -
NIOSH/ORAU Report: ORAUT-OTIB-0066, Rev 0 – Calculation of Dose from Intakes of Special Tritium Compounds [170 KB (14 pages)]
November 26, 2007
-
-
Telephone Calls with Claimants
-
Draft: Review of Close-Out Interview Procedure [19 KB (2 pages)] [535 KB (68 pages)]
Contract No. 200-2004-03805
Task Order No. 3
SCA-SEC-TASK3-0005
September 2007
-
-
Texas City Chemicals, Inc.
-
SC&A Presentation: Review of NIOSH’s Program Evaluation Report DCAS-PER-093, “Texas City Chemicals” [243 KB (12 pages)]
Presentation at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-093, “Texas City Chemicals, TBD Rev. 01” [586 KB (14 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PER093, Revision 0
May 5, 2022 -
SC&A Draft: Evaluation of Revision 01 of the Technical Basis Document for Texas City Chemicals, Inc., Texas City, TX [80 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SP002, Revision 0
September 21, 2020 -
SC&A Draft: Evaluation of Technical Basis Document for Texas City Chemicals, Inc., Texas City, Texas [440 KB (22 pages)]
Contract No. 211-2014-58081
Document No. SCA-TR-2018-SP004
May 18, 2018 -
SC&A Draft: A Focused Review of the NIOSH Evaluation Report for the Texas City Chemical Company SEC Petition [440 KB (44 pages)]
Contract No. 200-2004-03805
Task Order No. 5
July 2008
-
-
Tritium Exposures
U
-
United Nuclear Corporation
-
SC&A Draft: A Focused Review of the SEC Petition and NIOSH Evaluation Report for United Nuclear Corporation, Petition SEC-00116 [224 KB (37 pages)]
Contract No. 200-2009-28555
SCA-TR-SEC2010-0017
September 2010
W
-
W.R. Grace (Tennessee)
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A: Current Status of W. R. Grace TBD Findings [389 KB (42 pages)]
Presentation at the August 26-27, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A Matrix: Site Profile Issues Resolution for W. R. Grace & Company in Erwin, Tennessee, Rev. 2 [173 KB (20 pages)]
March 4, 2020 -
SC&A: Current Status of W. R. Grace TBD Finding 4 [217 KB (8 pages)]
Presentation at the January 30, 2020, Teleconference Meeting of the Uranium Refining Atomic Weapons Employers (AWEs) Work Group -
SC&A: Current Status of W.R. Grace TBD Finding 2 [229 KB (9 pages)]
Presentation at the January 30, 2020, Teleconference Meeting of the Uranium Refining Atomic Weapons Employers (AWEs) Work Group -
SC&A Draft: SC&A’s Review of the White Paper, “NIOSH Resolution of W. R. Grace Site Profile Finding 1” [82 KB (9 pages)]
Contract No. 75D301
Document No. SCA-TR-2019-SP003, Revision 0 19C04183
November 19, 2019 -
SC&A Draft: SC&A’s Review of the White Paper, “NIOSH Resolution of W. R. Grace Site Profile Findings 2 and 7” [115 KB (10 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SP004, Revision 0
November 18, 2019 -
SC&A Memo: SC&A’s Evaluation of NIOSH’s White Paper, “Neutron Dose Assignment for Plutonium Fuel at W.R. Grace” (Site Profile Finding 4) [59 KB (4 pages)]
September 26, 2017 -
SC&A Draft: Issues Resolution Matrix for W.R. Grace & Company in Erwin, Tennessee Site Profile, Rev. 0 [98 KB (8 pages)]
January 16, 2013 -
SC&A Draft: Review of the NIOSH Site Profile for the W.R. Grace and Company in Erwin, Tennessee [275 KB (39 pages)]
Contract No. 200-2009-28555
SCA-TR-SP2013-0041
January 16, 2013
-
-
Weldon Spring Plant
-
SC&A Presentation: Review of DCAS PER-083 for the Weldon Spring Plant, Weldon Spring, MO [502 KB (26 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of DCAS-PER-051 for the Weldon Spring Plant, Weldon Spring, MO [534 KB (25 pages)]
Presentation at the November 16, 2023, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-051, “Weldon Spring Plant” [516 KB (18 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER051, Revision 1
September 21, 2023 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-083, “Weldon Spring Plant TBD Revision” [570 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2023-PER083, Revision 1
September 22, 2023 -
SC&A Presentation: SC&A’s Review of DCAS-PER-092 for the Weldon Spring Plant, Weldon Spring, MO [292 KB (24 pages)]
Presentation at the September 29, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-092, “Weldon Spring Plant” [397 KB (17 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2022-PER092, Revision 0
June 9, 2022 -
SC&A: Weldon Spring Plant Site Profile Findings Matrix [442 KB (14 pages)]
February 1, 2018 -
SC&A: Weldon Spring Plant Site Profile Observations Matrix [360 KB (4 pages)]
February 1, 2018 -
SC&A: Weldon Spring Plant Site Profile Observations Matrix [263 KB (4 pages)]
November 10, 2017 -
SC&A: Weldon Spring Plant Site Profile Findings Matrix [427 KB (19 pages)]
November 10, 2017 -
SC&A Draft White Paper: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Hanford Site and Weldon Spring Plant, Rev. 0 [1 MB (42 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[Redact]
June 17, 2015 -
SC&A Draft White Paper: SC&’s Evaluation of the Weldon Spring Site Profile Changes Compared to the Original Findings [506 KB (16 pages)]
Contract Number 211-2014-58081
January 9, 2015 -
SC&A Memo: Potential Drying of Weldon Spring Pits [960 KB (8 pages)]
July 9, 2012 -
SC&A Draft White Paper: SC&A’s Summary Evaluation of DWE Errors (Blunders) in Weldon Spring Data [43 KB (5 pages)]
Contract No: 200-2009-28555
February 23, 2012 -
SC&A Draft White Paper: Evaluation of NIOSH’s Response to SC&A’s Concerns Regarding DWE Errors (Blunders) in Weldon Spring Data [120 KB (5 pages)]
Contract No: 200-2009-28555
January 17, 2012 -
SC&A Draft: SC&A’s Evaluation of NIOSH’s Response of September 7, 2011, to Daily Weighted Exposure Blunders in Weldon Spring Data [29 KB (4 pages)]
September 27, 2011 -
SC&A Draft: SC&A’s Initial Test of External and Bioassay Data Completeness for the Weldon Spring Site [55 KB (9 pages)]
August 15, 2011 -
SC&A Draft: Preliminary Issues from SC&A’s Review of NIOSH’s Evaluation Report for the Weldon Spring Site, Weldon Spring, Missouri, Special Exposure Cohort Petition SEC-00143 [167 KB (30 pages)]
Contract No. 200-2009-28555
SCA-SEC-2010-0015, Revision 0
October 2010 -
SC&A Draft: Review of the NIOSH Site Profile for the Weldon Spring Site in Weldon Spring, Missouri [582 KB (91 pages)]
Contract No. 200-2009-28555
Task Order No. 1
SCA-TR-TASK1-0028
February 2009
-
-
West Valley Demonstration Project
-
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021
-
-
Westinghouse Electric Corp. (New Jersey)
-
SC&A Draft: Review of Special Exposure Cohort Evaluation Report for SEC-00217, Rev. 0 [401 KB (20 pages)]
Contract No. 211-2014-58081
July 30, 2015
-
-
Westinghouse Nuclear Fuels Division
-
SC&A Presentation: Review of Three Advisory Board-Selected Cases Reworked for the Evaluation of Westinghouse Nuclear Fuels Division Template Revisions [683 KB (36 pages)]
Presentation at the May 25, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Presentation: Review of Three Advisory Board-Selected Cases Reworked for the Evaluation of Westinghouse Nuclear Fuels Division Template Revisions [740 KB (36 pages)]
Presentation at the February 15, 2022, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0049, Revision 02, “Estimating Doses for Plutonium Strongly Retained in the Lung” [1.3 MB (39 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR049, Revision 0
October 7, 2021 -
SC&A Draft White Paper: Supplemental Information and Response to Finding 434.1-C.1.1 for a Westinghouse Nuclear Fuels Division Dose Reconstruction [189 KB (22 pages)]
Contract No. 211-2014-58081
SCA-TR-DR2017-WP001, Revision 0
May 25, 2017 -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report DCAS-PER-052, “Westinghouse Nuclear Fuels Division” [409 KB (15 pages)]
Contract No. 211-2014-58081
SCA-TR-PR2014-0094, Rev. 0
October 6, 2014 -
SC&A Memo: Westinghouse Nuclear Fuels Division Dose Reconstruction Case from 18th set [178 KB (1 page)]
January 17, 2014
-
-
Worker Outreach Program Procedures
-
SC&A Working Draft: Issues Matrices Pertaining to the Review of OCAS-PR-012, Worker Outreach Program and ORAUT-PROC-0097, Conduct of the Worker Outreach Program Procedure (Rev. 6) [128 KB (22 pages)]
Contract No. 200-2009-28555
January 4, 2013 -
SC&A Working Draft: Issues Matrices Pertaining to the Review of OCAS-PR-012, Worker Outreach Program and ORAUT-PROC-0097, Conduct of the Worker Outreach Program Procedure (Rev. 5) [111 KB (20 pages)]
Contract No. 200-2009-28555
October 17, 2012 -
Draft: Review of OCAS-PR-012: Worker Outreach Program [366 KB (74 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2010-0002, Revision 0
April 2010 -
Draft: Conduct of the Worker Outreach Program Procedure [364 KB (36 pages)]
Contract No. 200-2004-03805
Task Order No. 3
SCA-TR-TASK3-0003, Addendum 1 – Revision 1
November 2007
-
Y
-
Y-12 Plant
-
SC&A Presentation: Review of ORAUT-RPRT-0060, Revision 00, “Neutron Dose from Highly Enriched Uranium” [258 KB (25 pages)]
Presentation at the November 8, 2024, Teleconference Meeting of the Subcommittee for Procedure Reviews -
SC&A Draft: SC&A’S Evaluation Of ORAUT-OTIB-0088, Revision 01, “External Dose Reconstruction” [296 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2021-PR088, Revision 0
September 3, 2021 -
SC&A Memo: Application of NOCTS Data 2021 [333 KB (8 pages)]
July 29, 2021 -
SC&A: Update on SEC-00250 Evaluation Report for the Y-12 Plant [264 KB (14 pages)]
Presentation at the December 8-9, 2020, Teleconference Meeting of the Advisory Board on Radiation and Worker Health -
SC&A: SC&A Review of SEC-00250 Evaluation Report for the Y-12 Plant [270 KB (13 pages)]
Presentation at the September 24, 2020, Teleconference Meeting of the Advisory Board’s Work Group on the Y-12 Plant -
SC&A Memo: Review of Multiple Imputation Methods Applied to Censored Bioassay Datasets [135 KB (7 pages)]
June 3, 2020 -
SC&A Draft: Review of NIOSH February 2020 Response to SC&A (September 2019) on Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants [246 KB (16 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SP001, Revision 0
July 13, 2020 -
SC&A: SC&A Review of the SEC-00250 Evaluation Report for the Y-12 Plant [635 KB (44 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2020-SEC001, Revision 0
February 21, 2020 - SC&A Draft: SC&A’s Review of NIOSH’s White Paper, “Neutron Dose Assignment for K-25 and Portsmouth Gaseous Diffusion Plants” [139 KB (9 pages)]
Contract No. 75D30119C04183
Document No. SCA-TR-2019-SP002, Revision 0
September 16, 2019 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0045, Revision 01, “Historical Evaluation of the Film Badge Dosimetry Program at the Y-12 Plant in Oak Ridge, Tennessee: Part 2 – Neutron Radiation” [147 KB (14 pages)]
Contract No. 211-2014-58081
SCA-TR-2019-PR003, Revision 0
January 14, 2019 -
SC&A Draft: SC&A’s Evaluation of ORAUT-OTIB-0044, Revision 01, “Historical Evaluation of the Film Badge Dosimetry Program at the Y-12 Facility in Oak Ridge, Tennessee: Part 1 – Gamma Radiation” [1 MB (32 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR006, Revision 0
July 17, 2017 -
SC&A Draft: Evaluation of ORAUT-OTIB-0064, Revision 02, Coworker External Dosimetry Data for the Y-12 National Security Complex [356 KB (17 pages)]
Contract No. 211-2014-58081
SCA-TR-2017-PR003, Revision 0
May 22, 2017 -
SC&A Memo: Y-12 ORAUT-OTIB-0013 and ORAUT-PROC-0042 Findings and Resolutions [71 KB (7 pages)]
October 20, 2016 -
SC&A Draft: Blind Dose Reconstruction of Case #[REDACTED] from the Y-12 National Security Complex and the X-10 Oak Ridge National Laboratory, Rev. 0 [4 MB (122 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[REDACTED]
February 24, 2014 -
SC&A: OCAS-PER-031, Subtasks 1–3 Evaluation of the National Security Complex (Y-12) TBD Revisions (July 15, 2013) [265 KB (19 pages)]
(Presentation from the November 7, 2013, Teleconference Meeting of the Advisory Board’s Subcommittee for Procedures Review) -
SC&A Draft: A Review of NIOSH’s Program Evaluation Report OCAS-PER-031, “Y-12 TBD Revisions” [565 KB (24 pages)]
Contract No. 200-2009-28555
SCA-TR-PR2013-0031, Rev. 0
July 15, 2013 -
SC&A Draft: Y-12 National Security Complex Site Profile Review [2 MB (204 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0007
September 19, 2005
-