Job Hazard Analysis

Key points

  • Prior to testing, identify a team to carry out a risk assessment using a job hazard analysis (JHA).
  • Download a JHA table template to record the risk assessment.
  • The risk assessment team, with testing personnel, should review the table daily (once completed) and discuss any changes to testing activities.

Overview

At your testing site, identify a team to perform a risk assessment using a job hazard analysis (JHA) prior to initiating testing activities. A simple table may be developed to perform and document the risk assessment prior to testing. The risk assessment team should review the JHA table once it is completed, with testing personnel, ideally daily. Additionally, the risk assessment team should discuss any changes to testing activities to ensure that potential hazards are identified before testing begins. A sample JHA table is shown below. Download or print this template of the JHA table [PDF][Word].

Job hazard analysis (sample text)

Testing Location: Site A

Analyst: Jane Doe

Date: 06/08/2021

Testing Activity

Risks

Risk Mitigations

Specimen collection

Exposure to harmful biological material during specimen collection

Change gloves between individuals when collecting specimens

Reagent mixing

Exposure to harmful biological material by aerosol generation

1) Place a cap on reagent bottles before mixing and tighten cap

2) Mix reagents gently while ensuring proper mixing

Discarding materials from completed tests

Exposure to harmful biological material through spread of biological material across testing surfaces

1) Carefully pick up and dispose completed test materials in appropriate biohazardous waste containers located near the last step of the testing process

2) Disinfect all testing surfaces after completion of testing